From mboxrd@z Thu Jan 1 00:00:00 1970 Return-Path: Received: from mail-io1-f49.google.com (mail-io1-f49.google.com [209.85.166.49]) by mail.openembedded.org (Postfix) with ESMTP id B83FE7D007 for ; Tue, 23 Jul 2019 17:48:46 +0000 (UTC) Received: by mail-io1-f49.google.com with SMTP id g20so83662479ioc.12 for ; Tue, 23 Jul 2019 10:48:48 -0700 (PDT) DKIM-Signature: v=1; a=rsa-sha256; c=relaxed/relaxed; d=gmail.com; s=20161025; h=from:to:cc:subject:date:message-id:mime-version:thread-index :content-language; bh=FqkahHjbz+azGsB4/hWFHYcfwJxTkZTJYEDZjifiWEE=; b=kkeZSNdTbJzKCcVPF3icD0GnaBiq+JhVgA5y5RJ3kuzP1lzG/UYneFo2W16GS6U8nC 9ctrTaN4DJp/Z73TpBbX8B3qfGFlErO9G8hAz3CQs2AE0P9SCksGSp2rv8W+3hBiZjbF LSAb4MReYs+qqMOeZT2r/IXn5MqeWw0TWqHCSH62Ek7pIPRzFwZ1priR2J0cOcsrg+9r T3m7PNS+771wjs50+aZJidnCoNYOEqUgJ3VN+UlAbTnhil6isQfCiM0P8uiLC/el1qAX 2nDEVws0jn9HsPkoV8hC4eC10CyZtBWq+mdQRB1vv66ZJBvDkDkyB8F6PrFaY2XOWiAG AOWw== X-Google-DKIM-Signature: v=1; a=rsa-sha256; c=relaxed/relaxed; d=1e100.net; s=20161025; h=x-gm-message-state:from:to:cc:subject:date:message-id:mime-version :thread-index:content-language; bh=FqkahHjbz+azGsB4/hWFHYcfwJxTkZTJYEDZjifiWEE=; b=N16ZbBkg9DMZ2CUlm38DbdBe/gV6e2Pf5c9u2DvRcF9w5W8sm2Z/AuuaBxD4IuVMlv imYZUxD/Kfli3tBP6Q9v+n4cG/kbbhGlNTIMoU8eakdWQpn3PyLoiz9VMtN3tO/IQKRL leFPqP+unvw6djhWHOhEX61wFjtLdkYaX0DZicdJLTq7LD610IVdbA56rBDBIkfNVCjD 5z7On9IEKiEa/NRD5JjUWa75VksDso9VFYUGS/T55zRP3/CjBQvJPpJm9HcPb2rn2ngf xVZysDNLEsoo5OgiS5qAYCO0/T19/LOcizTJDYlvFkkfyFb4BMKYbmR5o0KbhASBAb+b 5g9A== X-Gm-Message-State: APjAAAUBq3exWRxmC9R6oQUmoth8f3OHrVkYwk7fP/64qonpgAwA1ZmJ BBL5YL1T5H0+yEbXJQ+DkE4= X-Google-Smtp-Source: APXvYqw9N0XqovOun+DV4rYH+PY/Rtozv5SUz0UP8UVJY0J1MoL85ACdYWFVn/sc+k7P+O1YMTq7Wg== X-Received: by 2002:a02:ce35:: with SMTP id v21mr77947958jar.108.1563904127488; Tue, 23 Jul 2019 10:48:47 -0700 (PDT) Received: from sjolley ([96.79.126.57]) by smtp.gmail.com with ESMTPSA id l5sm76210702ioq.83.2019.07.23.10.48.46 (version=TLS1_2 cipher=ECDHE-RSA-AES128-GCM-SHA256 bits=128/128); Tue, 23 Jul 2019 10:48:46 -0700 (PDT) From: To: , Date: Tue, 23 Jul 2019 10:48:47 -0700 Message-ID: <006d01d5417e$e1c31180$a5493480$@gmail.com> MIME-Version: 1.0 X-Mailer: Microsoft Outlook 16.0 Thread-Index: AdVBdp0O46pykjeuSKmN5HMVFGmvUg== Cc: Lieu.Ta@windriver.com Subject: Yocto Project Status WW30'19 X-BeenThere: openembedded-core@lists.openembedded.org X-Mailman-Version: 2.1.12 Precedence: list List-Id: Patches and discussions about the oe-core layer List-Unsubscribe: , List-Archive: List-Post: List-Help: List-Subscribe: , X-List-Received-Date: Tue, 23 Jul 2019 17:48:47 -0000 Content-Type: multipart/alternative; boundary="----=_NextPart_000_006E_01D54144.3568CD60" Content-Language: en-us ------=_NextPart_000_006E_01D54144.3568CD60 Content-Type: text/plain; charset="us-ascii" Content-Transfer-Encoding: 7bit Current Dev Position: YP 2.8 M2 Next Deadline: YP 2.8 Milestone 2 Cutoff July 14th, 2019 SWAT Team Rotation: * SWAT lead is currently: Anuj * SWAT team rotation: Anuj -> Paul on July 26, 2019 * SWAT team rotation: Paul -> Ross on Aug. 2, 2019 * https://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team Next Team Meetings: * Bug Triage meeting Thursday July 25th at 7:30am PDT ( https://zoom.us/j/454367603) * Monthly Project Meeting Tuesday August 6th at 8am PDT ( https://zoom.us/j/990892712) * Twitch - Next event is Tuesday August 6th at 8am PDT ( https://www.twitch.tv/yocto_project) Key Status/Updates: * 2.7.1 was released * 2.6.3 has patches pending review and then will be built * We have a new "newcomer" bug category which are bugs suited to someone new to the project. These can be seen here: https://wiki.yoctoproject.org/wiki/Bug_Triage#Newcomer_Bugs * There are ongoing discussions on a few key topics which are summarized here for convenience. Please contribute if you have an interest in these areas: * Running the testsuites for glibc/binutils/gcc * Moving lsb to its own layer * Removing poky-lsb in favour of some configuration fragments * Reproducibility * Minimizing python2 dependencies * Configuration of init systems * Changing poky's init system default to systemd is running into a large number of testing failures on the autobuilder which puts that change at risk. * The autobuilder performance problem when stopping builds has been tracked down and fixed. The controller was also upgraded for some performance improvements (thanks Michael). * There are patches available which enable runqueue optimisations based on output comparisons of tasks. This removes the need to run later tasks if the output is unchanged and is based upon the previous hash equivalence server work. This feature should be a significant win for the users and is now working to a level where we'll likely make this a key feature of the next release. Planned Releases for YP 2.8: * M2 Cutoff 14th July * M2 Release 26th July * M3 Cutoff (Feature Freeze) 25th Aug * M3 Release 6th Sept * M4 Cutoff 30th Sept * 2.8 (M4) Final Release 25th Oct Planned upcoming dot releases: * YP 2.7.1 (Warrior) is released. * YP 2.6.3 (Thud) is intended for build after 2.7.1 is complete and before 2.8 M2. Tracking Metrics: * WDD 2483 (last week 2498) ( https://wiki.yoctoproject.org/charts/combo.html) * Poky Patch Metrics * Total patches found: 1499 (last week 1502) * Patches in the Pending State: 623 (42%) [last week 630 (42%)] Key Status Links for YP: https://wiki.yoctoproject.org/wiki/Yocto_Project_v2.8_Status https://wiki.yoctoproject.org/wiki/Yocto_2.8_Schedule https://wiki.yoctoproject.org/wiki/Yocto_2.8_Features The Status reports are now stored on the wiki at: https://wiki.yoctoproject.org/wiki/Weekly_Status [If anyone has suggestions for other information you'd like to see on this weekly status update, let us know!] Thanks, Stephen K. Jolley Yocto Project Project Manager * Cell: (208) 244-4460 * Email: sjolley.yp.pm@gmail.com ------=_NextPart_000_006E_01D54144.3568CD60 Content-Type: text/html; boundary="----=_NextPart_000_044A_01D53BDE.CF805410"; charset="us-ascii" Content-Transfer-Encoding: quoted-printable

Current Dev = Position: YP 2.8 M2

Next Deadline: YP = 2.8 Milestone 2 Cutoff July 14th, 2019

 

SWAT Team = Rotation:

 

Next Team = Meetings:

 

Key = Status/Updates:

  • 2.7.1 was = released
  • 2.6.3 has patches pending = review and then will be built
  • We have a new = “newcomer” bug category which are bugs suited to someone new = to the project. These can be seen here: https://wiki.yoctoproject.org/wiki/Bug_Triage#New= comer_Bugs
  • There are ongoing discussions = on a few key topics which are summarized here for convenience. Please = contribute if you have an interest in these = areas:
    • Running the testsuites for = glibc/binutils/gcc
    • Moving lsb to its own = layer
    • Removing poky-lsb in favour of = some configuration fragments
    • Reproducibility
    • Minimizing python2 = dependencies
    • Configuration of init = systems
  • Changing poky’s init = system default to systemd is running into a large number of testing = failures on the autobuilder which puts that change at = risk.
  • The autobuilder performance = problem when stopping builds has been tracked down and fixed. The = controller was also upgraded for some performance improvements (thanks = Michael).
  • There are patches available = which enable runqueue optimisations based on output comparisons of = tasks. This removes the need to run later tasks if the output is = unchanged and is based upon the previous hash equivalence server work. = This feature should be a significant win for the users and is now = working to a level where we’ll likely make this a key feature of = the next release.

 

Planned Releases = for YP 2.8:

  • M2 Cutoff 14th = July
  • M2 Release 26th = July
  • M3 Cutoff (Feature Freeze) 25th = Aug
  • M3 Release 6th = Sept
  • M4 Cutoff 30th = Sept
  • 2.8 (M4) Final Release 25th = Oct

 

Planned upcoming = dot releases:

  • YP 2.7.1 (Warrior) is = released.
  • YP 2.6.3 (Thud) is intended for = build after 2.7.1 is complete and before 2.8 = M2.

 

Tracking = Metrics:

 

Key Status Links = for YP:

https://wiki.yoctoproject.or= g/wiki/Yocto_Project_v2.8_Status

https://wiki.yoctoproject.or= g/wiki/Yocto_2.8_Schedule

https://wiki.yoctoproject.or= g/wiki/Yocto_2.8_Features

 

The Status reports = are now stored on the wiki at: https://wiki.yocto= project.org/wiki/Weekly_Status

 

[If anyone has = suggestions for other information you’d like to see on this weekly = status update, let us know!]

 

Thanks,

 

Stephen K. Jolley<= o:p>

Yocto = Project Project Manager

(    Cell:         = ;       (208) = 244-4460

* Email:           = ;   sjolley.yp.pm@gmail.com

 

------=_NextPart_000_006E_01D54144.3568CD60--