From mboxrd@z Thu Jan 1 00:00:00 1970 Return-Path: Received: from mail-pg1-f172.google.com (mail-pg1-f172.google.com [209.85.215.172]) by mail.openembedded.org (Postfix) with ESMTP id 1494B7D0F9 for ; Tue, 26 Mar 2019 14:54:17 +0000 (UTC) Received: by mail-pg1-f172.google.com with SMTP id u9so8363644pgo.7 for ; Tue, 26 Mar 2019 07:54:18 -0700 (PDT) DKIM-Signature: v=1; a=rsa-sha256; c=relaxed/relaxed; d=gmail.com; s=20161025; h=from:to:subject:date:message-id:mime-version:content-language :thread-index; bh=xCujBewFIsW+EqHiNU6ZGLcq1leQF+zHbN7w9HQixhc=; b=ZrdMMQpfqAPb1yzNFk2WT19KDZWGSzBJ88he2z8q6xBX0lzodWXwa29XDEIK7RtKDu OtUQtXWO9FsOBH5K8kT1VyNxElpRNpu/JqqZfoYcU1wYKHJKKK+A5tVTNZd1M7Gn9hyl dEFajZgpK/tJ29ITMz7WjUEkBDskRVGDs26H6opD5ExpaAzuQAq7qLwyq9ZAKZ7ztSQ1 E003FQwoy5w9zU7JP4MnQH9hkqaPtExrDCCPk4X7xLZKB1nS6YRi9PS+3RnTd+g2DYkw QsXhQdx68ptkQhTWtGqY92BjhDBf4GPLMZRloMn435g43gykBX1a1VCrrhMaenRJiHIm IWLg== X-Google-DKIM-Signature: v=1; a=rsa-sha256; c=relaxed/relaxed; d=1e100.net; s=20161025; h=x-gm-message-state:from:to:subject:date:message-id:mime-version :content-language:thread-index; bh=xCujBewFIsW+EqHiNU6ZGLcq1leQF+zHbN7w9HQixhc=; b=jJ/4rg8vE/cCOTFJhP/nEXZg6ImeDmR8ZezjNurGd+NicQbt7gIpxpDV2U2HEZCLib KkRxlTAWtObGmxPJooIhXbCPKHBS2hExMMZ1yk5t2fckjAbBb1OaiPvtYdOsRLLoUoDh 0110t9pGbk2CTijae2XOLGw7k8rTQvAcV85OovkAuevHPTrC4PmS4Npdx4BJhkcecSyT dshx0pJBWTKVin5zFGjiQ/VhTT1N7SaeFnoAail9Nra4Zp6GeR5vu7rx8wJ2sPrIJMXq 3U6iKe6cOSTebrAPdplDd5ANiCm2eMMpGzPD2wMSjA28yg4LN1TpBDrP7CS/AxsXWsgz aElA== X-Gm-Message-State: APjAAAUucPY1soJWByax/wig0t52jye2ze2VcMygn9s9UoiUKycw0C7y 497IxEclnPJluCPOezj+5cR77Ndy X-Google-Smtp-Source: APXvYqznBR2lSgpaxaVgavOpdcesFQ+LhPy77lXod420//bHWfC+NKBUMVjPEI+X5rApzebSAnbqxw== X-Received: by 2002:a62:1157:: with SMTP id z84mr8058090pfi.159.1553612058149; Tue, 26 Mar 2019 07:54:18 -0700 (PDT) Received: from sjolley (c-71-59-136-149.hsd1.or.comcast.net. [71.59.136.149]) by smtp.gmail.com with ESMTPSA id l12sm36182219pgn.83.2019.03.26.07.54.17 (version=TLS1_2 cipher=ECDHE-RSA-AES128-GCM-SHA256 bits=128/128); Tue, 26 Mar 2019 07:54:17 -0700 (PDT) From: To: , Date: Tue, 26 Mar 2019 07:54:17 -0700 Message-ID: <01b801d4e3e3$c9ee5c70$5dcb1550$@gmail.com> MIME-Version: 1.0 X-Mailer: Microsoft Outlook 16.0 Thread-Index: AdTj48loJpTB8ZAUQE226ImUb420zA== Subject: Yocto Project Status WW13'19 X-BeenThere: openembedded-core@lists.openembedded.org X-Mailman-Version: 2.1.12 Precedence: list List-Id: Patches and discussions about the oe-core layer List-Unsubscribe: , List-Archive: List-Post: List-Help: List-Subscribe: , X-List-Received-Date: Tue, 26 Mar 2019 14:54:18 -0000 Content-Type: multipart/alternative; boundary="----=_NextPart_000_01B9_01D4E3A9.1D93F140" Content-Language: en-us ------=_NextPart_000_01B9_01D4E3A9.1D93F140 Content-Type: text/plain; charset="us-ascii" Content-Transfer-Encoding: 7bit Current Dev Position: YP 2.7 M4 (New feature Freeze has begun.) Next Deadline: YP 2.7 M3 Release Target was Mar. 8, 2019 SWAT Team Rotation: * SWAT lead is currently: Paul * SWAT team rotation: Paul -> Ross on Mar. 30, 2019 * SWAT team rotation: Ross -> Amanda on Apr. 5, 2019 * https://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team Key Status/Updates: * M3 has been built and is currently in QA * There are a small number of upgrades which merged after M3 as it was felt better to be up to date in these cases along with various other fixes. The project is now very much in feature freeze and bug fixing working toward the final release though. * The OpenEmbedded election for its TSC members is now in the nomination phase. * For the stable releases, the autobuilder-helper changes have now merged and the resulttool patches are also backported on the relevant -next branches. This means we're ready to build both 2.5.3 and 2.6.2. Planned Releases for YP 2.7: * YP 2.7 M3 Cutoff was Feb. 25, 2019 * YP 2.7 M3 Release Target was Mar. 8, 2019 * YP 2.7 M4 Cutoff is Apr. 1, 2019 * YP 2.7 M4 Release Target is Apr. 26, 2019 Planned upcoming dot releases: * YP 2.5.3 (Sumo) will be targeted for build as soon as it is ready.. * YP 2.6.2 (Thud) will be targeted after YP 2.5.3 is done. Tracking Metrics: * WDD 2418 (last week 2432) ( https://wiki.yoctoproject.org/charts/combo.html) * Poky Patch Metrics * Total patches found: 1538 (last week 1526) * Patches in the Pending State: 656 (43%) [last week 656 (43%)] Key Status Links for YP: https://wiki.yoctoproject.org/wiki/Yocto_Project_v2.7_Status https://wiki.yoctoproject.org/wiki/Yocto_2.7_Schedule https://wiki.yoctoproject.org/wiki/Yocto_2.7_Features The Status reports are now stored on the wiki at: https://wiki.yoctoproject.org/wiki/Weekly_Status [If anyone has suggestions for other information you'd like to see on this weekly status update, let us know!] Thanks, Stephen K. Jolley Yocto Project Project Manager * Cell: (208) 244-4460 * Email: sjolley.yp.pm@gmail.com ------=_NextPart_000_01B9_01D4E3A9.1D93F140 Content-Type: text/html; boundary="----=_NextPart_000_0312_01D4DE28.C82BF890"; charset="us-ascii" Content-Transfer-Encoding: quoted-printable

Current Dev = Position: YP 2.7 M4 (New feature Freeze has = begun.)

Next Deadline: YP = 2.7 M3 Release Target was Mar. 8, 2019

 

SWAT Team = Rotation:

 

Key = Status/Updates:

  • M3 has been built and is = currently in QA
  • There are a small number of = upgrades which merged after M3 as it was felt better to be up to date in = these cases along with various other fixes. The project is now very much = in feature freeze and bug fixing working toward the final release = though.
  • The OpenEmbedded election for = its TSC members is now in the nomination = phase.
  • For the stable releases, the = autobuilder-helper changes have now merged and the resulttool patches = are also backported on the relevant -next branches. This means = we’re ready to build both 2.5.3 and = 2.6.2.

 

Planned Releases = for YP 2.7:

  • YP 2.7 M3 Cutoff was Feb. 25, = 2019
  • YP 2.7 M3 Release Target was = Mar. 8, 2019
  • YP 2.7 M4 Cutoff is Apr. 1, = 2019
  • YP 2.7 M4 Release Target is = Apr. 26, 2019

 

Planned upcoming = dot releases:

  • YP 2.5.3 (Sumo) will be = targeted for build as soon as it is ready..
  • YP 2.6.2 (Thud) will be = targeted after YP 2.5.3 is done.

 

Tracking = Metrics:

 

Key Status Links = for YP:

https://wiki.yoctoproject.or= g/wiki/Yocto_Project_v2.7_Status

https://wiki.yoctoproject.or= g/wiki/Yocto_2.7_Schedule

https://wiki.yoctoproject.or= g/wiki/Yocto_2.7_Features

 

The Status reports = are now stored on the wiki at: https://wiki.yocto= project.org/wiki/Weekly_Status

 

[If anyone has = suggestions for other information you’d like to see on this weekly = status update, let us know!]

 

Thanks,

 

Stephen K. Jolley<= o:p>

Yocto = Project Project Manager

(    Cell:         = ;       (208) = 244-4460

* Email:           = ;   sjolley.yp.pm@gmail.com

 

------=_NextPart_000_01B9_01D4E3A9.1D93F140--