From mboxrd@z Thu Jan 1 00:00:00 1970 Return-Path: Received: from mail.windriver.com (mail.windriver.com [147.11.1.11]) by mx1.pokylinux.org (Postfix) with ESMTP id 3A5474C810C0; Mon, 13 Dec 2010 10:31:05 -0600 (CST) Received: from ALA-MAIL03.corp.ad.wrs.com (ala-mail03 [147.11.57.144]) by mail.windriver.com (8.14.3/8.14.3) with ESMTP id oBDGV2Vg025472; Mon, 13 Dec 2010 08:31:02 -0800 (PST) Received: from ala-mail06.corp.ad.wrs.com ([147.11.57.147]) by ALA-MAIL03.corp.ad.wrs.com with Microsoft SMTPSVC(6.0.3790.1830); Mon, 13 Dec 2010 08:31:02 -0800 Received: from Macintosh-5.local ([172.25.36.226]) by ala-mail06.corp.ad.wrs.com with Microsoft SMTPSVC(6.0.3790.1830); Mon, 13 Dec 2010 08:31:02 -0800 Message-ID: <4D064A44.6080005@windriver.com> Date: Mon, 13 Dec 2010 10:31:00 -0600 From: Mark Hatle Organization: Wind River Systems User-Agent: Mozilla/5.0 (Macintosh; U; Intel Mac OS X 10.6; en-US; rv:1.9.2.13) Gecko/20101207 Thunderbird/3.1.7 MIME-Version: 1.0 To: "Tian, Kevin" References: <625BA99ED14B2D499DC4E29D8138F1504D5A7A1691@shsmsx502.ccr.corp.intel.com> In-Reply-To: <625BA99ED14B2D499DC4E29D8138F1504D5A7A1691@shsmsx502.ccr.corp.intel.com> X-OriginalArrivalTime: 13 Dec 2010 16:31:02.0657 (UTC) FILETIME=[21DCE710:01CB9AE3] X-Mailman-Approved-At: Mon, 13 Dec 2010 11:10:57 -0600 Cc: "yocto@yoctoproject.org" , "poky@yoctoproject.org" , "Wold, Saul" Subject: Re: update status of M2 sprint tasks X-BeenThere: poky@yoctoproject.org X-Mailman-Version: 2.1.13 Precedence: list List-Id: Poky build system developer discussion List-Unsubscribe: , List-Archive: List-Post: List-Help: List-Subscribe: , X-List-Received-Date: Mon, 13 Dec 2010 16:31:05 -0000 Content-Type: text/plain; charset=ISO-8859-1 Content-Transfer-Encoding: 7bit On 12/13/10 5:53 AM, Tian, Kevin wrote: > Hi, owners, > > Since M2 code frozen happened last week and now M2 test has been started, could owners > of each M2 sprint tasks update the latest status on the wiki? > > https://wiki.yoctoproject.org/wiki/Yocto_1.0_Schedule > > As Saul sent out earlier, we only accept bug fixes on M2 branch now. So if a given task has > not been done (WIP or on track), could you either move it into M3 or fill an updated date > when current one is past? > > --M2SB-- > > "Distro Audit: Package Description/Summary completed", "WIP, Done by Dec 08" (Mark) I have the work done and tested. Is it too late to submit this? (There are no code changes, just recipe Description/Summary changes..) > "Zypper/RPM (small writeup)", "WIP, Done by Dec 06" (Mark/Qing) The write up is done, and outside of the tree.. I just have to post it on the wiki.. > "oprofileUI", "WIP, done by Dec 10 " (Jessica) > > --M2SC-- > "Distro Audit: Licence Checksums ", "WIP, done by Dec 10 " (Saul) > "Zypper/RPM (upgrade to latest version)", "Starting, done by Dec 10" (Mark/Qing) > "push of all relevant Wind River patchs to Yocto ", "WIP, on track for completion by Dec 03 " (Mark) > "Tracing: blktrace and sysprof recipes ", "sysprof by Dec 03 " (Tom) > > --M2SD-- > "Yocto Installer for SDK Generator Installation functions support ", "WIP, done Dec 09" (Jessica) > "Yocto Installer support for image-creator ", "WIP" (Jessica) > > --M2SE-- > "Zypper/RPM (integration design)", "slipped out from sprint D" (Mark/Qing) > "Distro Audit: Upgrades Completed (Phase1)", "WIP" (Saul) > "Distro Audit: Src Checksums", "WIP, Done by Dec 9" (Saul) > "enable KVM with qemu", "on track" (Saul/Edwin) > "Performance Enhancement Completed", "on track being reviewed" (Saul/Dongxiao/Qing) > "User specified qemu config support", "on track for Dec 9" (Saul/Criping) > "SDK Version Control support in SDK generator installer", "on track" (Jessica) > "Tracing: Initial SystemTap recipe", "on track" (Tom) > "Documentation for swabber", "on track" (Alex) > "Defect triage process in public documented and implemented" (Saul) > > Thanks > Kevin