From mboxrd@z Thu Jan 1 00:00:00 1970 Return-Path: Received: from mga01.intel.com (mga01.intel.com [192.55.52.88]) by mx1.pokylinux.org (Postfix) with ESMTP id 473224C80048; Mon, 13 Dec 2010 12:29:32 -0600 (CST) Received: from fmsmga001.fm.intel.com ([10.253.24.23]) by fmsmga101.fm.intel.com with ESMTP; 13 Dec 2010 10:29:31 -0800 X-ExtLoop1: 1 X-IronPort-AV: E=Sophos;i="4.59,336,1288594800"; d="scan'208";a="867695925" Received: from unknown (HELO [10.24.5.122]) ([10.24.5.122]) by fmsmga001.fm.intel.com with ESMTP; 13 Dec 2010 10:29:31 -0800 Message-ID: <4D06660B.30707@intel.com> Date: Mon, 13 Dec 2010 10:29:31 -0800 From: Saul Wold User-Agent: Mozilla/5.0 (X11; U; Linux x86_64; en-US; rv:1.9.1.10) Gecko/20100621 Fedora/3.0.5-1.fc13 Lightning/1.0b2pre Thunderbird/3.0.5 MIME-Version: 1.0 To: "Tian, Kevin" References: <625BA99ED14B2D499DC4E29D8138F1504D5A7A1691@shsmsx502.ccr.corp.intel.com> In-Reply-To: <625BA99ED14B2D499DC4E29D8138F1504D5A7A1691@shsmsx502.ccr.corp.intel.com> Cc: "yocto@yoctoproject.org" , "poky@yoctoproject.org" Subject: Re: update status of M2 sprint tasks X-BeenThere: poky@yoctoproject.org X-Mailman-Version: 2.1.13 Precedence: list List-Id: Poky build system developer discussion List-Unsubscribe: , List-Archive: List-Post: List-Help: List-Subscribe: , X-List-Received-Date: Mon, 13 Dec 2010 18:29:32 -0000 Content-Type: text/plain; charset=ISO-8859-1; format=flowed Content-Transfer-Encoding: 7bit On 12/13/2010 03:53 AM, Tian, Kevin wrote: > Hi, owners, > > Since M2 code frozen happened last week and now M2 test has been started, could owners > of each M2 sprint tasks update the latest status on the wiki? > > https://wiki.yoctoproject.org/wiki/Yocto_1.0_Schedule > > As Saul sent out earlier, we only accept bug fixes on M2 branch now. So if a given task has > not been done (WIP or on track), could you either move it into M3 or fill an updated date > when current one is past? > > --M2SB-- > > "Distro Audit: Package Description/Summary completed", "WIP, Done by Dec 08" (Mark) > "Zypper/RPM (small writeup)", "WIP, Done by Dec 06" (Mark/Qing) > "oprofileUI", "WIP, done by Dec 10 " (Jessica) > > --M2SC-- > "Distro Audit: Licence Checksums ", "WIP, done by Dec 10 " (Saul) Pending Patch is in distro Stage > "Zypper/RPM (upgrade to latest version)", "Starting, done by Dec 10" (Mark/Qing) > "push of all relevant Wind River patchs to Yocto ", "WIP, on track for completion by Dec 03 " (Mark) > "Tracing: blktrace and sysprof recipes ", "sysprof by Dec 03 " (Tom) > > --M2SD-- > "Yocto Installer for SDK Generator Installation functions support ", "WIP, done Dec 09" (Jessica) > "Yocto Installer support for image-creator ", "WIP" (Jessica) > > --M2SE-- > "Zypper/RPM (integration design)", "slipped out from sprint D" (Mark/Qing) > "Distro Audit: Upgrades Completed (Phase1)", "WIP" (Saul) Phase one status was best effort on the the update list, and I will have a summary later this week. > "Distro Audit: Src Checksums", "WIP, Done by Dec 9" (Saul) All recipes now have SRC_URI Checksums, the checking work is part of the Fetch which is pending with Ke and Richard. > "enable KVM with qemu", "on track" (Saul/Edwin) Done and in Master > "Performance Enhancement Completed", "on track being reviewed" (Saul/Dongxiao/Qing) Code is being review by RP, and I think there is some questions about the usage of the hard links. > "User specified qemu config support", "on track for Dec 9" (Saul/Criping) Not sure what the status of this is currently. > "SDK Version Control support in SDK generator installer", "on track" (Jessica) > "Tracing: Initial SystemTap recipe", "on track" (Tom) > "Documentation for swabber", "on track" (Alex) > "Defect triage process in public documented and implemented" (Saul) Bug Triage Process is on the Public website, some images need to be updated and I now have the source for those, this can be independent from the release process. > > Thanks > Kevin