From mboxrd@z Thu Jan 1 00:00:00 1970 Return-Path: Message-ID: <1525663384.5064.1.camel@gmx.de> Subject: Re: [PATCH BUGFIX] block, bfq: postpone rq preparation to insert or merge From: Mike Galbraith To: Paolo Valente Cc: Jens Axboe , linux-block , LKML , Ulf Hansson , Mark Brown , linus.walleij@linaro.org, bfq-iosched@googlegroups.com, oleksandr@natalenko.name Date: Mon, 07 May 2018 05:23:04 +0200 In-Reply-To: <1525660992.5105.1.camel@gmx.de> References: <20180504171701.6876-1-paolo.valente@linaro.org> <1525463210.622.1.camel@gmx.de> <1525508378.5406.6.camel@gmx.de> <9F155F9F-F6B2-465A-BA4D-A86FF6825071@linaro.org> <1525532191.5406.15.camel@gmx.de> <223CABEA-71E0-426F-A4AB-17BA8437C978@linaro.org> <1525660992.5105.1.camel@gmx.de> Content-Type: text/plain; charset="ISO-8859-15" Mime-Version: 1.0 List-ID: On Mon, 2018-05-07 at 04:43 +0200, Mike Galbraith wrote: > On Sun, 2018-05-06 at 09:42 +0200, Paolo Valente wrote: > > > > I've attached a compressed patch (to avoid possible corruption from my > > mailer). I'm little confident, but no pain, no gain, right? > > > > If possible, apply this patch on top of the fix I proposed in this > > thread, just to eliminate possible further noise. Finally, the > > patch content follows. > > > > Hoping for a stroke of luck, > > FWIW, box didn't survive the first full build of the morning. Nor the second. -Mike