linux-kernel.vger.kernel.org archive mirror
 help / color / mirror / Atom feed
* [PATCH v2 1/3] sched/deadline: Zero out positive runtime after throttling constrained tasks
@ 2017-05-12  3:32 Xunlei Pang
  2017-05-12  3:32 ` [PATCH v2 2/3] sched/deadline: Throttle the task when missing its deadline Xunlei Pang
                   ` (2 more replies)
  0 siblings, 3 replies; 10+ messages in thread
From: Xunlei Pang @ 2017-05-12  3:32 UTC (permalink / raw)
  To: linux-kernel
  Cc: Peter Zijlstra, Juri Lelli, Ingo Molnar, Steven Rostedt,
	Luca Abeni, Daniel Bristot de Oliveira, Xunlei Pang

When a contrained task is throttled by dl_check_constrained_dl(),
it may carry the remaining positive runtime, as a result when
dl_task_timer() fires and calls replenish_dl_entity(), it will
not be replenished correctly due to the positive dl_se->runtime.

This patch assigns its runtime to 0 if positive after throttling.

Fixes: df8eac8cafce ("sched/deadline: Throttle a constrained deadline task activated after the deadline)
Acked-by: Daniel Bristot de Oliveira <bristot@redhat.com>
Signed-off-by: Xunlei Pang <xlpang@redhat.com>
---
 kernel/sched/deadline.c | 2 ++
 1 file changed, 2 insertions(+)

diff --git a/kernel/sched/deadline.c b/kernel/sched/deadline.c
index a2ce590..d3d291e 100644
--- a/kernel/sched/deadline.c
+++ b/kernel/sched/deadline.c
@@ -723,6 +723,8 @@ static inline void dl_check_constrained_dl(struct sched_dl_entity *dl_se)
 		if (unlikely(dl_se->dl_boosted || !start_dl_timer(p)))
 			return;
 		dl_se->dl_throttled = 1;
+		if (dl_se->runtime > 0)
+			dl_se->runtime = 0;
 	}
 }
 
-- 
1.8.3.1

^ permalink raw reply related	[flat|nested] 10+ messages in thread

end of thread, other threads:[~2017-05-15  4:05 UTC | newest]

Thread overview: 10+ messages (download: mbox.gz follow: Atom feed
-- links below jump to the message on this page --
2017-05-12  3:32 [PATCH v2 1/3] sched/deadline: Zero out positive runtime after throttling constrained tasks Xunlei Pang
2017-05-12  3:32 ` [PATCH v2 2/3] sched/deadline: Throttle the task when missing its deadline Xunlei Pang
2017-05-12  5:57   ` luca abeni
2017-05-12  6:53     ` Xunlei Pang
2017-05-12  7:01       ` luca abeni
2017-05-12  7:19         ` Xunlei Pang
2017-05-12 20:58           ` luca abeni
2017-05-15  3:50             ` Xunlei Pang
2017-05-12  3:32 ` [PATCH v2 3/3] sched/deadline: Add statistics to track runtime underruns Xunlei Pang
2017-05-15  4:07 ` [PATCH v2 1/3] sched/deadline: Zero out positive runtime after throttling constrained tasks Xunlei Pang

This is a public inbox, see mirroring instructions
for how to clone and mirror all data and code used for this inbox;
as well as URLs for NNTP newsgroup(s).