From mboxrd@z Thu Jan 1 00:00:00 1970 Return-Path: Received: from mail-pj1-f51.google.com (mail-pj1-f51.google.com [209.85.216.51]) by mail.openembedded.org (Postfix) with ESMTP id F3BC67F7DD for ; Tue, 19 Nov 2019 15:48:13 +0000 (UTC) Received: by mail-pj1-f51.google.com with SMTP id a16so2790249pjs.13 for ; Tue, 19 Nov 2019 07:48:15 -0800 (PST) DKIM-Signature: v=1; a=rsa-sha256; c=relaxed/relaxed; d=gmail.com; s=20161025; h=from:to:subject:date:message-id:mime-version:thread-index :content-language; bh=VL6egl44wgQiKlbJ4QNLODEOFKai1k3FHtHoKE1lizk=; b=u+bdpbDo5ek36NdtU6D81N+pAcRLm1lhv+joXa5wPDn69EUFqkPTuMmFRvitBmbJHt TDnWrOQ4+YVp58r2vNeJ505T9nvB4B1P+bX2bpB8wmfwunFAiLJInWcfnW9i5fWbNtZr vCNvZplAtcL2rPuo/XgXoNoCHSXWHh9O7tGNiAT5K0vwk8KzKVGc1VHuqZKaDYy6Iy1y jyusgnwsY/4RLPSuBxzuJvRWA82vkQtBsUx5XHjDCgzYowOaockS2KFwGTbJhDb6mk8G mbzplbBhs57s23JUYODiV/UnUoaH27tsp4bv/b4b5OHDn9bL1QET+94lyQqPkkOk5sM3 MfYg== X-Google-DKIM-Signature: v=1; a=rsa-sha256; c=relaxed/relaxed; d=1e100.net; s=20161025; h=x-gm-message-state:from:to:subject:date:message-id:mime-version :thread-index:content-language; bh=VL6egl44wgQiKlbJ4QNLODEOFKai1k3FHtHoKE1lizk=; b=igFRJBkL2tN1au+5JQm2gBFT5w3UCODtS4kmHnlO89fGbebqrqeRccorNUg6HOOIiD NuOeQW7/DO9n5BGIHWhs7SdG7C1slhKTwGE1McJLuGhmXN0hjyI9vjAHMzC2qyGGReJL GfLLG87ULY/Nw0idrRQ5lsC6OXvVWmvTe8oCi9chHE3kPLNOqhCyR+jFDH/P0GGINzW9 5vqOmtGWW5VoMwu9AwzTAe1uiWi7a+5bUossDkZ4ZAGz6f0p7nDSP8qoqZCDUPc53IXT btyRHazOhMHOYYXOxIQeJBt5zqra7p64ac2URIogwFTpjPekPbxvzah16o9SFYxLtqnp srMw== X-Gm-Message-State: APjAAAXJTXoFZE021BBfTDbffrbf8YPNWulO1jytnviUzD3uljGXkQQQ t45K7BQLA27af6WQDnohN4o= X-Google-Smtp-Source: APXvYqwtT63p1aBlNZuLqrnVPJ93lbG3VV43AITNtUnCl5N8dme//2S0X9mYAsPAFH5b5GGBs5XSug== X-Received: by 2002:a17:90a:610:: with SMTP id j16mr7420501pjj.85.1574178494767; Tue, 19 Nov 2019 07:48:14 -0800 (PST) Received: from sjolley (c-71-59-136-149.hsd1.or.comcast.net. [71.59.136.149]) by smtp.gmail.com with ESMTPSA id w7sm27131796pfb.101.2019.11.19.07.48.14 (version=TLS1_2 cipher=ECDHE-RSA-AES128-GCM-SHA256 bits=128/128); Tue, 19 Nov 2019 07:48:14 -0800 (PST) From: To: , Date: Tue, 19 Nov 2019 07:48:13 -0800 Message-ID: <033301d59ef0$c0dff4e0$429fdea0$@gmail.com> MIME-Version: 1.0 X-Mailer: Microsoft Outlook 16.0 Thread-Index: AdWe8KqUKkV3/l3ZRf6/QWJ0H5tLiw== Subject: Yocto Project Status WW47'19 X-BeenThere: openembedded-core@lists.openembedded.org X-Mailman-Version: 2.1.12 Precedence: list List-Id: Patches and discussions about the oe-core layer List-Unsubscribe: , List-Archive: List-Post: List-Help: List-Subscribe: , X-List-Received-Date: Tue, 19 Nov 2019 15:48:14 -0000 Content-Type: multipart/alternative; boundary="----=_NextPart_000_0334_01D59EAD.B2BF7400" Content-Language: en-us ------=_NextPart_000_0334_01D59EAD.B2BF7400 Content-Type: text/plain; charset="us-ascii" Content-Transfer-Encoding: 7bit Current Dev Position: YP 3.1 M1 Next Deadline: YP 3.1 M1 build Dec. 2, 2019 Next Team Meetings: * Bug Triage meeting Thursday Nov. 21st at 7:30am PDT ( https://zoom.us/j/454367603) * Monthly Project Meeting Tuesday Dec. 3rd at 8am PDT ( https://zoom.us/j/990892712) * Weekly Engineering Sync Tuesday Nov. 19th at 8am PDT ( https://zoom.us/j/990892712) * Twitch - Next event is Tuesday Dec. 10th at 8am PDT ( https://www.twitch.tv/yocto_project) Key Status/Updates: * YP 2.7.2 is under review by the TSC and likely to be released. * Tests were made on making reproducibility the default for poky. There were several issues found for which bugs were filed: * A double free issue in opkg (Alejandro looking into, thanks) * devtool failures (Paul sent a fix, thanks) * recipetool failures (Richard sent a fix) * Tests were made on making the hashserver default for poky. There were also several issues found and RP is trying to understand and work through those. At least one critical issue has been identified and due to be tested. * The SWAT team no longer has enough people on it to make it sustainable and has therefore been disbanded. This means build owners need to triage their own build failures. Richard will be responsible for failures in the scheduled master builds. * Intermittent build failures continue to hamper builds, particularly combined with the above issues and as few people are available to attempt to debug and resolve them. * The TSC is working on LTS plans, productive discussions have been had and a new policy on handling this and stable releases should be available in the next couple of weeks. * We are continuing to collect ideas for YP 3.1 in this document: https://docs.google.com/document/d/1UKZIGe88-eq3-pOPtkAvFAegbQDzhy_f4ye64yjn ABc/edit?usp=sharing * If anyone has any status items for the project they'd like to add to the weekly reports, please email Richard and Stephen. Proposed YP 3.1 Milestone Dates: * YP 3.1 M1 Proposed build date 12/2/2019 * YP 3.1 M1 Proposed release date 12/13/2019 * YP 3.1 M2 Proposed build date 1/20/2020 * YP 3.1 M2 Proposed release date 1/31/2020 * YP 3.1 M3 Proposed build date 2/24/2020 * YP 3.1 M3 Proposed release date 3/6/2020 * YP 3.1 M4 Proposed build date 3/30/2020 * YP 3.1 M4 Proposed release date 4/24/2020 Planned upcoming dot releases: * YP 2.7.2 Should release this week. * YP 3.0.1 Proposed build date 11/25/2019 * YP 3.0.1 Proposed release date 12/06/2019 * YP 2.7.3 Proposed build date 2/10/20 * YP 2.7.3 Proposed release date 2/21/20 * YP 3.0.2 Proposed build date 2/3/20 * YP 3.0.2 Proposed release date 2/14/20 Tracking Metrics: * WDD 2533 (last week 2508) ( https://wiki.yoctoproject.org/charts/combo.html) * Poky Patch Metrics * Total patches found: 1461 (last week 1445) * Patches in the Pending State: 579 (40%) [last week 579 (40%)] The Yocto Project's technical governance is through its Technical Steering Committee, more information is available at: https://wiki.yoctoproject.org/wiki/TSC The Status reports are now stored on the wiki at: https://wiki.yoctoproject.org/wiki/Weekly_Status [If anyone has suggestions for other information you'd like to see on this weekly status update, let us know!] Thanks, Stephen K. Jolley Yocto Project Project Manager * Cell: (208) 244-4460 * Email: sjolley.yp.pm@gmail.com ------=_NextPart_000_0334_01D59EAD.B2BF7400 Content-Type: text/html; boundary="----=_NextPart_000_014D_01D5992D.65D0ABD0"; charset="us-ascii" Content-Transfer-Encoding: quoted-printable

Current Dev = Position: YP 3.1 M1 

Next Deadline: YP = 3.1 M1 build Dec. 2, 2019

 

Next Team = Meetings:

 

Key = Status/Updates:

  • YP 2.7.2 is under review by the = TSC and likely to be released.
  • Tests were made on making = reproducibility the default for poky. There were several issues found = for which bugs were filed:
    • A double free issue in opkg = (Alejandro looking into, thanks)
    • devtool failures (Paul sent a = fix, thanks)
    • recipetool failures (Richard = sent a fix)
  • Tests were made on making the = hashserver default for poky. There were also several issues found and RP = is trying to understand and work through those. At least one critical = issue has been identified and due to be = tested.
  • The SWAT team no longer has = enough people on it to make it sustainable and has therefore been = disbanded. This means build owners need to triage their own build = failures. Richard will be responsible for failures in the scheduled = master builds.
  • Intermittent build failures = continue to hamper builds, particularly combined with the above issues = and as few people are available to attempt to debug and resolve = them.
  • The TSC is working on LTS = plans, productive discussions have been had and a new policy on handling = this and stable releases should be available in the next couple of = weeks.
  • We are continuing to collect = ideas for YP 3.1 in this document: https://docs.google.com/document/d/1UKZIGe88-eq3-= pOPtkAvFAegbQDzhy_f4ye64yjnABc/edit?usp=3Dsharing
  • If anyone has any status items = for the project they’d like to add to the weekly reports, please = email Richard and Stephen.

 

Proposed YP 3.1 = Milestone Dates:

  • YP 3.1 M1 Proposed build date = 12/2/2019
  • YP 3.1 M1 Proposed release date = 12/13/2019
  • YP 3.1 M2 Proposed build date = 1/20/2020
  • YP 3.1 M2 Proposed release date = 1/31/2020
  • YP 3.1 M3 Proposed build date = 2/24/2020
  • YP 3.1 M3 Proposed release date = 3/6/2020
  • YP 3.1 M4 Proposed build = date  3/30/2020
  • YP 3.1 M4 Proposed release = date  4/24/2020

 

Planned upcoming = dot releases:

  • YP 2.7.2 Should release this = week.
  • YP 3.0.1 Proposed build = date  11/25/2019
  • YP 3.0.1 Proposed release date = 12/06/2019
  • YP 2.7.3 Proposed build = date  2/10/20
  • YP 2.7.3 Proposed release date = 2/21/20
  • YP 3.0.2 Proposed build = date  2/3/20
  • YP 3.0.2 Proposed release date = 2/14/20

 

Tracking = Metrics:

 

The Yocto = Project’s technical governance is through its Technical Steering = Committee, more information is available at:

https://wiki.yocto= project.org/wiki/TSC

 

The Status reports = are now stored on the wiki at: https://wiki.yocto= project.org/wiki/Weekly_Status

 

[If anyone has = suggestions for other information you’d like to see on this weekly = status update, let us know!]

 

Thanks,

 

Stephen K. Jolley<= o:p>

Yocto = Project Project Manager

(    Cell:        = ;        (208) = 244-4460

* Email:          = ;    sjolley.yp.pm@gmail.com

 

------=_NextPart_000_0334_01D59EAD.B2BF7400--