From mboxrd@z Thu Jan 1 00:00:00 1970 Return-Path: Received: from mail-io1-f44.google.com (mail-io1-f44.google.com [209.85.166.44]) by mail.openembedded.org (Postfix) with ESMTP id 1A9097D3E6 for ; Tue, 16 Jul 2019 21:00:21 +0000 (UTC) Received: by mail-io1-f44.google.com with SMTP id s7so42187828iob.11 for ; Tue, 16 Jul 2019 14:00:23 -0700 (PDT) DKIM-Signature: v=1; a=rsa-sha256; c=relaxed/relaxed; d=gmail.com; s=20161025; h=from:to:cc:subject:date:message-id:mime-version:thread-index :content-language; bh=aIn5eGeD4/y0T0wqbP8ozlWgiZ3ddWrcgw0kRqqXb3s=; b=gkv5a9IP5yW392GiEAjtFrJlKKj+qDEUdlB0PkkEoXrXBK+xEFyFxi+3og0T+iMiSy K/SRniyS+Op8zxybUnTdW59qoDuaSZ87uMfJFDJ1wjKUD4/RxlW8+RU492DEpHFtIXpO e9cOOog+aGBnp8okbOHMGynYTbfRbzt2D/quQ6RTz0xzkyC0Ggx7r7V22SykzDt2bsYw NA0e4bAOI8l07itqEvDT8pHDkApKSu6M7MuQ0dWZossdNiJoRbquP5NWVyE4JMHdxgh7 Be51l+o8LzIH31vkcxJD0fikqfXmLxeGJKQaR8Zujy8nnoy78JpYZaIYVkt1X12ZGnxs gUTg== X-Google-DKIM-Signature: v=1; a=rsa-sha256; c=relaxed/relaxed; d=1e100.net; s=20161025; h=x-gm-message-state:from:to:cc:subject:date:message-id:mime-version :thread-index:content-language; bh=aIn5eGeD4/y0T0wqbP8ozlWgiZ3ddWrcgw0kRqqXb3s=; b=dRFA8tSP0eH/bi7NOJ4TtgcGKNQu0vuZtJmpygConynGqpVqEMGJok5LqSXJ4FUZgY hEuWH8Yn4xxX7DMWWdu7meaul07XQ7uxPvBhu4qDrxRPwrIFGeIV1PAjwQzrXkclF1Cg gVI+TfV4e1GSLm07Oq5fc7GL7qcf6q1K9wKZi3QHP2rQCR/Jn/4uFSJO0dGRH+co19D3 ElVC9RWyKoUMCFhZmxPXkdfF9EeGX8oL0V/vbce/K8VmWBRIrVzFHU+4jFeIBCyR2gvP 5bO2ujs5IGr0tbWaABO7QSH2dG+ouu8ESYcNhFqJeO1CmaRmB0ggHz6HTbUmYC/VZRqc 53yg== X-Gm-Message-State: APjAAAWvFeR6/ni4+Q9UGSoGTyzH0Eflhe7rZH0FK54GuoLaum8MWC18 ZLtYVjDDIiMd5SEhKbtJ7uI= X-Google-Smtp-Source: APXvYqzwx7yI1jU3U3byI00g9OoQ4Yp58sVeww3QtYfO8oc562X5zom2MrvP4B/Z2If+SbPo0JOKng== X-Received: by 2002:a02:29ce:: with SMTP id p197mr28588614jap.139.1563310823007; Tue, 16 Jul 2019 14:00:23 -0700 (PDT) Received: from sjolley ([96.79.126.57]) by smtp.gmail.com with ESMTPSA id e22sm16979316iob.66.2019.07.16.14.00.21 (version=TLS1_2 cipher=ECDHE-RSA-AES128-GCM-SHA256 bits=128/128); Tue, 16 Jul 2019 14:00:22 -0700 (PDT) From: To: , Date: Tue, 16 Jul 2019 14:00:21 -0700 Message-ID: <044901d53c19$7bdd7e60$73987b20$@gmail.com> MIME-Version: 1.0 X-Mailer: Microsoft Outlook 16.0 Thread-Index: AdU8GVMrlzaXonLhRj2IcyGMofOaYg== Cc: Lieu.Ta@windriver.com Subject: Yocto Project Status WW29'19 X-BeenThere: openembedded-core@lists.openembedded.org X-Mailman-Version: 2.1.12 Precedence: list List-Id: Patches and discussions about the oe-core layer List-Unsubscribe: , List-Archive: List-Post: List-Help: List-Subscribe: , X-List-Received-Date: Tue, 16 Jul 2019 21:00:22 -0000 Content-Type: multipart/alternative; boundary="----=_NextPart_000_044A_01D53BDE.CF805410" Content-Language: en-us ------=_NextPart_000_044A_01D53BDE.CF805410 Content-Type: text/plain; charset="us-ascii" Content-Transfer-Encoding: 7bit Current Dev Position: YP 2.8 M2 Next Deadline: YP 2.8 Milestone 2 Cutoff July 14th, 2019 SWAT Team Rotation: * SWAT lead is currently: Amanda * SWAT team rotation: Amanda -> Anuj on July 19, 2019 * SWAT team rotation: Anuj -> Paul on July 26, 2019 * https://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team Next Team Meetings: * Bug Triage meeting Thursday July 18th at 7:30am PDT ( https://zoom.us/j/454367603) * Monthly Project Meeting Tuesday August 6th at 8am PDT ( https://zoom.us/j/990892712) * Twitch - Next event is Tuesday August 13th at 8am PDT ( https://www.twitch.tv/yocto_project) Key Status/Updates: * 2.7.1 is cleared for release and will be announced shortly * 2.6.3 has two remaining issues before it can be built * We have a new "newcomer" bug category which are bugs suited to someone new to the project. These can be seen here: https://wiki.yoctoproject.org/wiki/Bug_Triage#Newcomer_Bugs * General patch backlog and merging is running back to normal * Our numbers of patches in the metadata has been slowly decreasing and I wanted to mention how much we appreciate anyone doing cleanup of old/stale data. Over time it is making a significant difference! * There are ongoing discussions on a few key topics which are summarised here for convenience. Please contribute if you have an interest in these areas: * Running the testsuites for glibc/binutils/gcc * Moving lsb to its own layer * Removing poky-lsb in favour of some configuration fragments * Reproducibility * Minimising python2 dependencies * Configuration of init systems * Bitbake changes which change the way runqueue works quite radically have merged. If people see errors with setscene or normal task execution people do report them. * Runqueue change to optimise sstate usage/sharing in multiconfig builds merged. Please report if its not working where you'd expect it to. Planned Releases for YP 2.8: * M2 Cutoff 14th July * M2 Release 26th July * M3 Cutoff (Feature Freeze) 25th Aug * M3 Release 6th Sept * M4 Cutoff 30th Sept * 2.8 (M4) Final Release 25th Oct Planned upcoming dot releases: * YP 2.7.1 (Warrior) is ready for release. * YP 2.6.3 (Thud) is intended for build after 2.7.1 is complete and before 2.8 M2 Tracking Metrics: * WDD 2498 (last week 2496) ( https://wiki.yoctoproject.org/charts/combo.html) * Poky Patch Metrics * Total patches found: 1502 (last week 1506) * Patches in the Pending State: 630 (42%) [last week 634 (42%)] Key Status Links for YP: https://wiki.yoctoproject.org/wiki/Yocto_Project_v2.8_Status https://wiki.yoctoproject.org/wiki/Yocto_2.8_Schedule https://wiki.yoctoproject.org/wiki/Yocto_2.8_Features The Status reports are now stored on the wiki at: https://wiki.yoctoproject.org/wiki/Weekly_Status [If anyone has suggestions for other information you'd like to see on this weekly status update, let us know!] Thanks, Stephen K. Jolley Yocto Project Project Manager * Cell: (208) 244-4460 * Email: sjolley.yp.pm@gmail.com ------=_NextPart_000_044A_01D53BDE.CF805410 Content-Type: text/html; boundary="----=_NextPart_000_03F6_01D535C2.EFBC72D0"; charset="us-ascii" Content-Transfer-Encoding: quoted-printable

Current Dev = Position: YP 2.8 M2

Next Deadline: YP = 2.8 Milestone 2 Cutoff July 14th, 2019

 

SWAT Team = Rotation:

 

Next Team = Meetings:

 

Key = Status/Updates:

  • 2.7.1 is cleared for release = and will be announced shortly
  • 2.6.3 has two remaining issues = before it can be built
  • We have a new = “newcomer” bug category which are bugs suited to someone new = to the project. These can be seen here: https://wiki.yoctoproject.org/wiki/Bug_Triage#New= comer_Bugs
  • General patch backlog and = merging is running back to normal
  • Our numbers of patches in the = metadata has been slowly decreasing and I wanted to mention how much we = appreciate anyone doing cleanup of old/stale data. Over time it is = making a significant difference!
  • There are ongoing discussions = on a few key topics which are summarised here for convenience. Please = contribute if you have an interest in these = areas:
    • Running the testsuites for = glibc/binutils/gcc
    • Moving lsb to its own = layer
    • Removing poky-lsb in favour of = some configuration fragments
    • Reproducibility
    • Minimising python2 = dependencies
    • Configuration of init = systems
  • Bitbake changes which change = the way runqueue works quite radically have merged. If people see errors = with setscene or normal task execution people do report = them.
  • Runqueue change to optimise = sstate usage/sharing in multiconfig builds merged. Please report if its = not working where you’d expect it = to.

 

Planned Releases = for YP 2.8:

  • M2 Cutoff 14th = July
  • M2 Release 26th = July
  • M3 Cutoff (Feature Freeze) 25th = Aug
  • M3 Release 6th = Sept
  • M4 Cutoff 30th = Sept
  • 2.8 (M4) Final Release 25th = Oct

 

Planned upcoming = dot releases:

  • YP 2.7.1 (Warrior) is ready for = release.
  • YP 2.6.3 (Thud) is intended for = build after 2.7.1 is complete and before 2.8 = M2

 

Tracking = Metrics:

 

Key Status Links = for YP:

https://wiki.yoctoproject.or= g/wiki/Yocto_Project_v2.8_Status

https://wiki.yoctoproject.or= g/wiki/Yocto_2.8_Schedule

https://wiki.yoctoproject.or= g/wiki/Yocto_2.8_Features

 

The Status reports = are now stored on the wiki at: https://wiki.yocto= project.org/wiki/Weekly_Status

 

[If anyone has = suggestions for other information you’d like to see on this weekly = status update, let us know!]

 

Thanks,

 

Stephen K. Jolley<= o:p>

Yocto = Project Project Manager

(    Cell:         = ;       (208) = 244-4460

* Email:           = ;   sjolley.yp.pm@gmail.com

 