From mboxrd@z Thu Jan 1 00:00:00 1970 Return-Path: Received: from mail-pf1-f181.google.com (mail-pf1-f181.google.com [209.85.210.181]) by mail.openembedded.org (Postfix) with ESMTP id 5F2B87C310 for ; Tue, 5 Feb 2019 15:48:11 +0000 (UTC) Received: by mail-pf1-f181.google.com with SMTP id r136so1640725pfc.6 for ; Tue, 05 Feb 2019 07:48:12 -0800 (PST) DKIM-Signature: v=1; a=rsa-sha256; c=relaxed/relaxed; d=gmail.com; s=20161025; h=from:to:subject:date:message-id:mime-version:thread-index :content-language; bh=7tS1OKCHC11YGPBWuvOqZv/9/cwlVYx2IoQUZOvUJQQ=; b=IEpCTCL3yvh4FHeeXxLUwjJmn9eQhZuDamiweTNk917YMAvh7ZYuKP5zv3LHXx+9gW a9By0hmhx75u44zZCAYeD5R+hzaGgrnRmrjeV/DanC9ZpNYWfE3RXcFn8zbBYKReIiEb qcORzCzUe6OjK9X50bpwhfrAtgjcGKsjSwWsgiTnVCa5nXDOSwIO9tSeHk2+ooxgiAgC +Jof9OvtKnz83lyS4hSYER2Urf7ZxTJ9npONiBUr1PEnlypDgL3y5lN9kahZN+xxNLNh BSbE24lAL1jcNTCKTgguTTQu1Fsw7yITmF3QDO+QzHzRXI7V7cv9kOmlVMN4FCcK3BNu 1NHQ== X-Google-DKIM-Signature: v=1; a=rsa-sha256; c=relaxed/relaxed; d=1e100.net; s=20161025; h=x-gm-message-state:from:to:subject:date:message-id:mime-version :thread-index:content-language; bh=7tS1OKCHC11YGPBWuvOqZv/9/cwlVYx2IoQUZOvUJQQ=; b=i29PaluWEfEiZkQcpyPND++xMq5/WRaFyhaa3Pvsh79aUHqgGBr0s540R077XE0FCy TlTLOCj0HNy5zE5Lk4ijKea4qiI0lpLoqUV0WKnqnneweuJ7VkNPuaalsxxmdgFusZY7 R145JENY9N2QSbhKSPOglNTw5vAAvcrvLMG3FNW0SBlfiymdtDe1AKI4BYC52pdZTIAV BMc6eiiMV5ZNOsqzbRgbmDtANTDLFbagYTRXoPrYbH/zfx9BOY/U3hONbTgm+du1DRLi pOO8bDV9Wh2kVS4gm8zqU7UU+FKciyP6HgLfu0mIxyijM9VwG+oZwi8HdtbwxWLxqpII 3wdQ== X-Gm-Message-State: AHQUAuZFOJpYgoCbtlbhMsNCWHhyB7ZbnllOn1LmtCRZ4GIOCRGcQFEx k1KbwhP5GBukaJwqUaMRPqWr7B+v X-Google-Smtp-Source: AHgI3IbmvC4c9XMazthIxtPXifdOIJrH1JxitDEmeH5R2rz8vptKPeIg6XbHvl5GJRPPya4JEJHXmw== X-Received: by 2002:a62:7504:: with SMTP id q4mr5557284pfc.180.1549381692310; Tue, 05 Feb 2019 07:48:12 -0800 (PST) Received: from sjolley (c-71-59-136-149.hsd1.or.comcast.net. [71.59.136.149]) by smtp.gmail.com with ESMTPSA id b26sm8291654pfe.91.2019.02.05.07.48.11 (version=TLS1_2 cipher=ECDHE-RSA-AES128-GCM-SHA256 bits=128/128); Tue, 05 Feb 2019 07:48:11 -0800 (PST) From: To: , Date: Tue, 5 Feb 2019 07:48:12 -0800 Message-ID: <04b301d4bd6a$33c5c890$9b5159b0$@gmail.com> MIME-Version: 1.0 X-Mailer: Microsoft Outlook 16.0 Thread-Index: AdS9aSKlilzlN9/BSN+wXl4CBo7/DQ== Subject: Yocto Project Status WW06'19 X-BeenThere: openembedded-core@lists.openembedded.org X-Mailman-Version: 2.1.12 Precedence: list List-Id: Patches and discussions about the oe-core layer List-Unsubscribe: , List-Archive: List-Post: List-Help: List-Subscribe: , X-List-Received-Date: Tue, 05 Feb 2019 15:48:11 -0000 Content-Type: multipart/alternative; boundary="----=_NextPart_000_04B4_01D4BD27.25A3C110" Content-Language: en-us ------=_NextPart_000_04B4_01D4BD27.25A3C110 Content-Type: text/plain; charset="us-ascii" Content-Transfer-Encoding: 7bit Current Dev Position: YP 2.7 M3 Next Deadline: YP 2.7 M3 Cutoff is Feb. 25, 2019 SWAT Team Rotation: * SWAT lead is currently: Anuj * SWAT team rotation: Anuj -> Paul on Feb. 8, 2019 * SWAT team rotation: Paul -> Ross on Feb. 15, 2019 * https://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team Key Status/Updates: * YP 2.6.1 was released on Feb. 4, 2019. * YP 2.7 M2 was built and is in QA and is 79% done. See: https://wiki.yoctoproject.org/wiki/2.7_QA_Status * Some major recipe upgrades merged (glibc, binutils, llvm) * Some "prework" patches for various series merged (util-linux, virtgl) but the main series are still pending development or review * Various ptest-runner and ptest runtime testing integration fixes merged but many problems with the tests remain no volunteers to help resolve issues. * We're seeing test failures which highlight major problems with the archiver class, in particular the src.rpm component of it. I've proposed we remove it, if you do care about it please step up and help fix it else it will be removed. The src.rpm support is limited anyhow and likely to mislead user expectations so removing it may be a good thing. * The recipe reporting system integration with the layer index is now complete and available at: https://layers.openembedded.org/rrs/recipes/OE-Core/2.7/M3/. Historical data has not yet been imported to it. * The project autobuilder is running at slightly reduced capacity (but not functionality) due to hardware failures. * The project is considering moving its mailing list hosting to groups.io, if anyone has any experience of that, positive or negative please let Michael, Nico and Richard know * We're becoming seriously concerned about the lack of response to the last round of AUH patches Planned Releases for YP 2.7: * YP 2.7 M2 is built and in QA. * YP 2.7 M2 Release Target is Feb. 1, 2019 * YP 2.7 M3 Cutoff is Feb. 25, 2019 * YP 2.7 M3 Release Target is Mar. 8, 2019 * YP 2.7 M4 Cutoff is Apr. 1, 2019 * YP 2.7 M4 Release Target is Apr. 26, 2019 Planned upcoming dot releases: * YP 2.5.3 (Sumo) will be targeted after YP 2.7 M2 is done. * YP 2.5.4 (Sumo) will be targeted after YP 2.7 M4 is done. * YP 2.6.2 (Thud) will be targeted after YP 2.5.4 is done. Tracking Metrics: * WDD 2356 (last week 2393) ( https://wiki.yoctoproject.org/charts/combo.html) * Poky Patch Metrics * Total patches found: 1572 (last week 1583 * Patches in the Pending State: 678 (43%) [last week 677 (43%)] Key Status Links for YP: https://wiki.yoctoproject.org/wiki/Yocto_Project_v2.7_Status https://wiki.yoctoproject.org/wiki/Yocto_2.7_Schedule https://wiki.yoctoproject.org/wiki/Yocto_2.7_Features The Status reports are now stored on the wiki at: https://wiki.yoctoproject.org/wiki/Weekly_Status [If anyone has suggestions for other information you'd like to see on this weekly status update, let us know!] Thanks, Stephen K. Jolley Yocto Project Project Manager * Cell: (208) 244-4460 * Email: sjolley.yp.pm@gmail.com ------=_NextPart_000_04B4_01D4BD27.25A3C110 Content-Type: text/html; charset="us-ascii" Content-Transfer-Encoding: quoted-printable

Current Dev = Position: YP 2.7 M3

Next Deadline: YP = 2.7 M3 Cutoff is Feb. 25, 2019

 

SWAT Team = Rotation:

 

Key = Status/Updates:

  • YP 2.6.1 was released on Feb. = 4, 2019.
  • YP 2.7 M2 was built and is in = QA and is 79% done.  See: https://wiki.yoctoproject.org/wiki/2.7_QA_Status<= /span>
  • Some major recipe upgrades = merged (glibc, binutils, llvm)
  • Some “prework” = patches for various series merged (util-linux, virtgl) but the main = series are still pending development or review
  • Various ptest-runner and ptest = runtime testing integration fixes merged but many problems with the = tests remain no volunteers to help resolve = issues.
  • We’re seeing test = failures which highlight major problems with the archiver class, in = particular the src.rpm component of it. I’ve proposed we remove = it, if you do care about it please step up and help fix it else it will = be removed. The src.rpm support is limited anyhow and likely to mislead = user expectations so removing it may be a good = thing.
  • The recipe reporting system = integration with the layer index is now complete and available at: https://layers.openembedded.org/rrs/recipes/OE-Co= re/2.7/M3/. Historical data has not yet been imported to = it.
  • The project autobuilder is = running at slightly reduced capacity (but not functionality) due to = hardware failures.
  • The project is considering = moving its mailing list hosting to groups.io, if anyone has any = experience of that, positive or negative please let Michael, Nico and = Richard know
  • We’re becoming seriously = concerned about the lack of response to the last round of AUH = patches

 

Planned Releases = for YP 2.7:

  • YP 2.7 M2 is built and in = QA.
  • YP 2.7 M2 Release Target is = Feb. 1, 2019
  • YP 2.7 M3 Cutoff is Feb. 25, = 2019
  • YP 2.7 M3 Release Target is = Mar. 8, 2019
  • YP 2.7 M4 Cutoff is Apr. 1, = 2019
  • YP 2.7 M4 Release Target is = Apr. 26, 2019

 

Planned upcoming = dot releases:

  • YP 2.5.3 (Sumo) will be = targeted after YP 2.7 M2 is done.
  • YP 2.5.4 (Sumo) will be = targeted after YP 2.7 M4 is done.
  • YP 2.6.2 (Thud) will be = targeted after YP 2.5.4 is done.

 

Tracking = Metrics:

 

Key Status Links = for YP:

https://wiki.yoctoproject.or= g/wiki/Yocto_Project_v2.7_Status

https://wiki.yoctoproject.or= g/wiki/Yocto_2.7_Schedule

https://wiki.yoctoproject.or= g/wiki/Yocto_2.7_Features

 

The Status reports = are now stored on the wiki at: https://wiki.yocto= project.org/wiki/Weekly_Status

 

[If anyone has = suggestions for other information you’d like to see on this weekly = status update, let us know!]

 

Thanks,

 

Stephen K. Jolley<= o:p>

Yocto = Project Project Manager

(    Cell:        = ;        (208) = 244-4460

* Email:          = ;    sjolley.yp.pm@gmail.com

 

------=_NextPart_000_04B4_01D4BD27.25A3C110--