From mboxrd@z Thu Jan 1 00:00:00 1970 Return-Path: Received: from mail-io1-f46.google.com (mail-io1-f46.google.com [209.85.166.46]) by mail.openembedded.org (Postfix) with ESMTP id 17DD87C434 for ; Tue, 18 Jun 2019 21:22:29 +0000 (UTC) Received: by mail-io1-f46.google.com with SMTP id s7so33147407iob.11 for ; Tue, 18 Jun 2019 14:22:30 -0700 (PDT) DKIM-Signature: v=1; a=rsa-sha256; c=relaxed/relaxed; d=gmail.com; s=20161025; h=from:to:subject:date:message-id:mime-version:thread-index :content-language; bh=YsjDldHxDZg6yfO5FdZ9TwdzntWptyAIVXiWXNE91Rw=; b=hMCAV9sIppS/+YSDM5UK7JOtM8Mu0jy59xAaKd4/Ts9j8zTe/9ozWgdnjKp/7Rm4cP kWcPbnb6A1XURyiAbf7uy2l6Bmz+iwCNNzpKXXotgQTMW9YhMaC/cg1ogAzI9nkfzB30 NSKtZBgGgSOoysHMi7sHulAqn8K9jrqRa8JuSzF9MOJD6VVrevvwKQMIirWQ5rzvg6ky VhYTabhDlZePt3m4MZmgAwlzaKnwV0ni9IYh8gwcEZpixo87R4g6BUfTs2QK0NOczAw8 JGzyBROcL1/CK+WSTuzjFTAMrXE9WnptfoWqu82fuOr8uUMhrHvfysPVSrgPWseuguJY P3Ag== X-Google-DKIM-Signature: v=1; a=rsa-sha256; c=relaxed/relaxed; d=1e100.net; s=20161025; h=x-gm-message-state:from:to:subject:date:message-id:mime-version :thread-index:content-language; bh=YsjDldHxDZg6yfO5FdZ9TwdzntWptyAIVXiWXNE91Rw=; b=SdNQ9N+6EYV0GG5EehBoBHIV/cBKeDvoRGdO7lL4qLT+SurRBQ6aNJugTiL73KP7VZ zgoyGht9Nz0ZLq0cd9bBjzbzz2invJPZz8U0XHfc8AVHtTQqMAjiBPvUT/jMmyirb1gW mofHssDpGCrAIphNDhVHdMBqnWL9uLFMruJRslXPJfCt9M8Pfp4j4CC8nzfB18icbKB7 cdJfjmg5Z9xpFccqpPUKFHTSFTsGVyUVYXvMdMl9a4QsnLjuCgpSPhiyZFC7LJ0zbqoI InKlENBouhS6Hb9a5SSx0ErmeJeYJdKWjcaQb577BIDzmp6tDI9kdql8JrZkv9jUzvek NILg== X-Gm-Message-State: APjAAAV6c9NdFcCsuDYYGGZfGk6DrkIMggneT4SXqVfUB8up7TNR4acB rKsMJGuerKoVCwd1dHR8P2s= X-Google-Smtp-Source: APXvYqwXp7rlJqLHT7213hrtFG01rjECk9IL+UnkKFndqKDdR3ztokLqi5hjklOhDMxKF5/+aM+aQQ== X-Received: by 2002:a6b:e005:: with SMTP id z5mr3339091iog.161.1560892950056; Tue, 18 Jun 2019 14:22:30 -0700 (PDT) Received: from sjolley ([96.79.126.57]) by smtp.gmail.com with ESMTPSA id b3sm13868248iot.23.2019.06.18.14.22.29 (version=TLS1_2 cipher=ECDHE-RSA-AES128-GCM-SHA256 bits=128/128); Tue, 18 Jun 2019 14:22:29 -0700 (PDT) From: To: , Date: Tue, 18 Jun 2019 14:22:31 -0700 Message-ID: <054e01d5261b$f0bd7be0$d23873a0$@gmail.com> MIME-Version: 1.0 X-Mailer: Microsoft Outlook 16.0 Thread-Index: AdUmG+Hlsp/FMrRxRxyKteXW6rebGg== Subject: Yocto Project Status WW25'19 X-BeenThere: openembedded-core@lists.openembedded.org X-Mailman-Version: 2.1.12 Precedence: list List-Id: Patches and discussions about the oe-core layer List-Unsubscribe: , List-Archive: List-Post: List-Help: List-Subscribe: , X-List-Received-Date: Tue, 18 Jun 2019 21:22:30 -0000 Content-Type: multipart/alternative; boundary="----=_NextPart_000_054F_01D525E1.4460C6C0" Content-Language: en-us ------=_NextPart_000_054F_01D525E1.4460C6C0 Content-Type: text/plain; charset="us-ascii" Content-Transfer-Encoding: 7bit Current Dev Position: YP 2.8 M2 Next Deadline: YP 2.8 Milestone 2 Cutoff July 14th, 2019 SWAT Team Rotation: * SWAT lead is currently: Paul * SWAT team rotation: Paul -> Ross on June 21, 2019 * SWAT team rotation: Ross -> Amanda on June 28, 2019 * https://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team Next Team Meetings: * Bug Triage meeting Thursday June 20th at 7:30am PDT ( https://zoom.us/j/454367603) * Monthly Project Meeting Tuesday July 2nd at 8am PDT ( https://zoom.us/j/990892712) * Twitch - Next event is Tuesday 9th July at 8am PDT ( https://www.twitch.tv/yocto_project) Key Status/Updates: * 2.8 M1 has been through QA and is waiting on responses from YP TSC members on release readiness. It had more issues that would be ideal but most were relatively minor and are being worked upon, several with known causes now with fixes in master. As such its likely to be released. * Stephen is recovering from the accident and will now respond to emails. We're pleased to have him back and wish him a continued speedy recovery! * Mailing lists are proving to be a tricky subject. Some people are having trouble with emails not making it to the lists which we recognise is a serious issue. Equally, our groups.io plan isn't proving workable without major user visible change due to the current domain structure we have. It is being worked on as a priority to find a way forward. * We have a new "newcomer" bug category which are bugs suited to someone new to the project. These can be seen here: https://wiki.yoctoproject.org/wiki/Bug_Triage#Newcomer_Bugs * We're grateful to Sandy, WindRiver and Michael for helping get patchtest back into operation. Its tests are looking like they could do with a little improvement but it is catching some issues and great to see progress with it again. * During M2 Richard plans to look into our options for changing runqueue to better support more advanced sstate usage. This may have an impact on how quickly patches merge as the work there is involved and needs focus. * We'd like to remind people that where test suites exist, we'd appreciate it if people would run them before they send patches, e.g. "oe-selftest -r devtool" or "oe-selftest -r wic". Planned Releases for YP 2.8: * M1 is built and out of QA * M2 Cutoff 14th July * M2 Release 26th July * M3 Cutoff (Feature Freeze) 25th Aug * M3 Release 6th Sept * M4 Cutoff 30th Sept * 2.8 (M4) Final Release 25th Oct Planned upcoming dot releases: * YP 2.7.1 (Warrior) is planned for build imminently now that 2.8 M1 is done * YP 2.6.3 (Thud) is intended for build after 2.7.1 is complete and before 2.8 M2 Tracking Metrics: * WDD 2479 (last week 2478) ( https://wiki.yoctoproject.org/charts/combo.html) * Poky Patch Metrics * Total patches found: 1511 (last week 1507) * Patches in the Pending State: 641 (43%) [last week 641 (43%)] Key Status Links for YP: https://wiki.yoctoproject.org/wiki/Yocto_Project_v2.8_Status https://wiki.yoctoproject.org/wiki/Yocto_2.8_Schedule https://wiki.yoctoproject.org/wiki/Yocto_2.8_Features The Status reports are now stored on the wiki at: https://wiki.yoctoproject.org/wiki/Weekly_Status [If anyone has suggestions for other information you'd like to see on this weekly status update, let us know!] Thanks, Stephen K. Jolley Yocto Project Project Manager * Cell: (208) 244-4460 * Email: sjolley.yp.pm@gmail.com ------=_NextPart_000_054F_01D525E1.4460C6C0 Content-Type: text/html; charset="us-ascii" Content-Transfer-Encoding: quoted-printable

Current Dev = Position: YP 2.8 M2

Next Deadline: YP = 2.8 Milestone 2 Cutoff July 14th, 2019

 

SWAT Team = Rotation:

 

Next Team = Meetings:

 

Key = Status/Updates:

  • 2.8 M1 has been through QA and = is waiting on responses from YP TSC members on release readiness. It had = more issues that would be ideal but most were relatively minor and are = being worked upon, several with known causes now with fixes in master. = As such its likely to be released.
  • Stephen is recovering from the = accident and will now respond to emails. We’re pleased to have him = back and wish him a continued speedy recovery!
  • Mailing lists are proving to be = a tricky subject. Some people are having trouble with emails not making = it to the lists which we recognise is a serious issue. Equally, our = groups.io plan isn’t proving workable without major user visible = change due to the current domain structure we have. It is being worked = on as a priority to find a way forward.
  • We have a new = “newcomer” bug category which are bugs suited to someone new = to the project. These can be seen here: https://wiki.yoctoproject.org/wiki/Bug_Triage#New= comer_Bugs
  • We’re grateful to Sandy, = WindRiver and Michael for helping get patchtest back into operation. Its = tests are looking like they could do with a little improvement but it is = catching some issues and great to see progress with it = again.
  • During M2 Richard plans to look = into our options for changing runqueue to better support more advanced = sstate usage. This may have an impact on how quickly patches merge as = the work there is involved and needs focus.
  • We’d like to remind = people that where test suites exist, we’d appreciate it if people = would run them before they send patches, e.g. “oe-selftest -r = devtool” or “oe-selftest -r = wic”.

 

Planned Releases = for YP 2.8:

  • M1 is built and out of = QA
  • M2 Cutoff 14th = July
  • M2 Release 26th = July
  • M3 Cutoff (Feature Freeze) 25th = Aug
  • M3 Release 6th = Sept
  • M4 Cutoff 30th = Sept
  • 2.8 (M4) Final Release 25th = Oct

 

Planned upcoming = dot releases:

  • YP 2.7.1 (Warrior) is planned = for build imminently now that 2.8 M1 is done
  • YP 2.6.3 (Thud) is intended for = build after 2.7.1 is complete and before 2.8 = M2

 

Tracking = Metrics:

 

Key Status Links = for YP:

https://wiki.yoctoproject.or= g/wiki/Yocto_Project_v2.8_Status

https://wiki.yoctoproject.or= g/wiki/Yocto_2.8_Schedule

https://wiki.yoctoproject.or= g/wiki/Yocto_2.8_Features

 

The Status reports = are now stored on the wiki at: https://wiki.yocto= project.org/wiki/Weekly_Status

 

[If anyone has = suggestions for other information you’d like to see on this weekly = status update, let us know!]

 

Thanks,

 

Stephen K. Jolley<= o:p>

Yocto = Project Project Manager

(    Cell:         = ;       (208) = 244-4460

* Email:           = ;   sjolley.yp.pm@gmail.com

 

------=_NextPart_000_054F_01D525E1.4460C6C0--