From mboxrd@z Thu Jan 1 00:00:00 1970 Return-Path: Received: from mail-pg1-f176.google.com (mail-pg1-f176.google.com [209.85.215.176]) by mail.openembedded.org (Postfix) with ESMTP id 1D7E87D28D for ; Tue, 6 Aug 2019 15:28:08 +0000 (UTC) Received: by mail-pg1-f176.google.com with SMTP id i18so41780829pgl.11 for ; Tue, 06 Aug 2019 08:28:09 -0700 (PDT) DKIM-Signature: v=1; a=rsa-sha256; c=relaxed/relaxed; d=gmail.com; s=20161025; h=from:to:cc:subject:date:message-id:mime-version:thread-index :content-language; bh=GB6vvmS+/V72S97NC9d2FFWn9AWqkxLeuvd7Y5YIj1g=; b=pEAsSdJ5SY1WzgF42rjHh1RA0G/6v1aGul7o4YcMJmGVRZcMLQiC7tX+egAWWBqbne LtMfLVFMNd91KZL/b3TMzHf1Cd2I3qGqrn159Dtxnsh/FWJFSeKUs+twLo13dwglglCE sQ8tbjNB9Qo3hN/EjF5RD2Hzm8Pi7i0b1hY58z7Fmo0rEtDWtrxS60fw1ckiBArTiWfz ZOPwMNS+IfJXLuMZ/Pq3gDd6lSeR01V7f4gCFYbxeDgiKokqcEC8dNt3WWpSizF/IGPA OvndSkNP+uRQi2z4gSnS0swSSknVHyGHpunK1O5icZioxiowUpUOPDCoPGyq1deS2pJb f9WA== X-Google-DKIM-Signature: v=1; a=rsa-sha256; c=relaxed/relaxed; d=1e100.net; s=20161025; h=x-gm-message-state:from:to:cc:subject:date:message-id:mime-version :thread-index:content-language; bh=GB6vvmS+/V72S97NC9d2FFWn9AWqkxLeuvd7Y5YIj1g=; b=c/T/cBLxcQkFc5X+IpAK+EoUz2huVIAMftBqK6sbSGolvldaq2vsYzafroMO1qDr7f ELV2fEqYMFQzZCQ+OBFRDzeXsB5aKb72GxTBX5smIAmuEspMuscRTvH++Z/r6ypV2HY1 o3dl6+/lyBnUte9DcyCAjgHkav781/Q38Dsyh0KT2ejaFFnyzsBLUhDMS3zwbHA+tVmC yrrk31KAUCbllepXQDl3IsvCc8VjYjIK+mNFtVY+ab2069jonAjUbWH7QhVePK4QVp9A I282WCK72MIr4/jfObzp759zPD8clMVs2Gy3K4KG9WcCw3hEwuP1aEx+BG4e5tlS+UhV f6DQ== X-Gm-Message-State: APjAAAWYC5jwQN9MNxCphZPSZja6wCeqxtx3DcjoKZdD7Rmul4ihsQEH m1UXygGSTdxJ/AcwInFK0pY= X-Google-Smtp-Source: APXvYqxK0Ae4YQgmlY3g8GYfNwZAvC51kzpX0sn+Xk7Ot9ZORMwwPl49YgAd8fSclOkPuyEdw/i1Ug== X-Received: by 2002:a17:90a:3225:: with SMTP id k34mr3720772pjb.31.1565105289053; Tue, 06 Aug 2019 08:28:09 -0700 (PDT) Received: from sjolley (c-71-59-136-149.hsd1.or.comcast.net. [71.59.136.149]) by smtp.gmail.com with ESMTPSA id s66sm92881070pfs.8.2019.08.06.08.28.08 (version=TLS1_2 cipher=ECDHE-RSA-AES128-GCM-SHA256 bits=128/128); Tue, 06 Aug 2019 08:28:08 -0700 (PDT) From: To: , Date: Tue, 6 Aug 2019 08:28:08 -0700 Message-ID: <07cf01d54c6b$8d28ca50$a77a5ef0$@gmail.com> MIME-Version: 1.0 X-Mailer: Microsoft Outlook 16.0 Thread-Index: AdVMa1gfhiaPyhTzSXSZUAuxXMqTcA== Cc: Lieu.Ta@windriver.com Subject: Yocto Project Status WW32'19 X-BeenThere: openembedded-core@lists.openembedded.org X-Mailman-Version: 2.1.12 Precedence: list List-Id: Patches and discussions about the oe-core layer List-Unsubscribe: , List-Archive: List-Post: List-Help: List-Subscribe: , X-List-Received-Date: Tue, 06 Aug 2019 15:28:08 -0000 Content-Type: multipart/alternative; boundary="----=_NextPart_000_07D0_01D54C30.E0CBC710" Content-Language: en-us ------=_NextPart_000_07D0_01D54C30.E0CBC710 Content-Type: text/plain; charset="us-ascii" Content-Transfer-Encoding: 7bit Current Dev Position: YP 2.8 M3 Next Deadline: YP 2.8 Milestone M3 Cutoff (Feature Freeze) Aug 25, 2019 SWAT Team Rotation: * SWAT lead is currently: Ross * SWAT team rotation: Ross -> Amanda on Aug. 9, 2019 * SWAT team rotation: Amanda -> Chen on Aug. 16, 2019 * https://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team Next Team Meetings: * Bug Triage meeting Thursday August 8th at 7:30am PDT ( https://zoom.us/j/454367603) * Monthly Project Meeting Tuesday August 6th at 8am PDT ( https://zoom.us/j/990892712) * Twitch - Next event is Tuesday August 6th at 8am PDT ( https://www.twitch.tv/yocto_project) Key Status/Updates: * YP 2.8 M2 is due for release this week * YP 2.6.3 is in QA * We have a new "newcomer" bug category which are bugs suited to someone new to the project. These can be seen here: https://wiki.yoctoproject.org/wiki/Bug_Triage#Newcomer_Bugs * This release which was 2.8 will now become 3.0 * The project is working on some mentor and mentee opportunities. Please see the separate email from Nicolas on the yocto list about this. * Patches to bitbake to enable the task scheduler to react to "equivalent" build output have merged. There is more information about this major change in a separate email: http://lists.openembedded.org/pipermail/openembedded-core/2019-August/285300 .html It is hoped this change should improve productivity and reduce rebuilds. * In making some of these changes, there were some API changes in bitbake, notably the removal of the bb.build.FuncFailed exception, the signature generator task representation changed and there were some siggen function API changes. * libx11-diet was removed as its not really appropriate on a modern locale aware system. Planned Releases for YP 3.0 {2.8}: * M2 is out of QA and being reviewed. * M2 Release 26th July * M3 Cutoff (Feature Freeze) 25th Aug * M3 Release 6th Sept * M4 Cutoff 30th Sept - this will be YP 3.0. * YP 3.0 {2.8 (M4)} Final Release 25th Oct Planned upcoming dot releases: * YP 2.7.2 (Warrior) is planned for after 2.8 M2 release. * YP 2.6.3 (Thud) is iin QA. Tracking Metrics: * WDD 2481 (last week 2466) ( https://wiki.yoctoproject.org/charts/combo.html) * Poky Patch Metrics * Total patches found: 1496 (last week 1498) * Patches in the Pending State: 615 (41%) [last week 619 (41%)] Key Status Links for YP: https://wiki.yoctoproject.org/wiki/Yocto_Project_v2.8_Status https://wiki.yoctoproject.org/wiki/Yocto_2.8_Schedule https://wiki.yoctoproject.org/wiki/Yocto_2.8_Features The Yocto Project's technical governance is through its Technical Steering Committee, more information is available at: https://wiki.yoctoproject.org/wiki/TSC The Status reports are now stored on the wiki at: https://wiki.yoctoproject.org/wiki/Weekly_Status [If anyone has suggestions for other information you'd like to see on this weekly status update, let us know!] Thanks, Stephen K. Jolley Yocto Project Project Manager * Cell: (208) 244-4460 * Email: sjolley.yp.pm@gmail.com ------=_NextPart_000_07D0_01D54C30.E0CBC710 Content-Type: text/html; boundary="----=_NextPart_000_04B4_01D546AE.FB83CB70"; charset="us-ascii" Content-Transfer-Encoding: quoted-printable

Current Dev = Position: YP 2.8 M3

Next Deadline: YP = 2.8 Milestone M3 Cutoff (Feature Freeze) Aug 25, = 2019

 

SWAT Team = Rotation:

 

Next Team = Meetings:

 

Key = Status/Updates:

  • YP 2.8 M2 is due for release = this week
  • YP 2.6.3 is in = QA
  • We have a new = “newcomer” bug category which are bugs suited to someone new = to the project. These can be seen here: https://wiki.yoctoproject.org/wiki/Bug_Triage#New= comer_Bugs
  • This release which was 2.8 will = now become 3.0
  • The project is working on some = mentor and mentee opportunities. Please see the separate email from = Nicolas on the yocto list about this.
  • Patches to bitbake to enable = the task scheduler to react to “equivalent” build output = have merged. There is more information about this major change in a = separate email:

http://lists.opene= mbedded.org/pipermail/openembedded-core/2019-August/285300.html

It is hoped this = change should improve productivity and reduce = rebuilds.

 

Planned Releases = for YP 3.0 {2.8}:

 

Planned upcoming = dot releases:

 

Tracking = Metrics:

 

Key Status Links = for YP:

https://wiki.yoctoproject.or= g/wiki/Yocto_Project_v2.8_Status

https://wiki.yoctoproject.or= g/wiki/Yocto_2.8_Schedule

https://wiki.yoctoproject.or= g/wiki/Yocto_2.8_Features

 

The Yocto = Project’s technical governance is through its Technical Steering = Committee, more information is available at:

https://wiki.yocto= project.org/wiki/TSC

 

The Status reports = are now stored on the wiki at: https://wiki.yocto= project.org/wiki/Weekly_Status

 

[If anyone has = suggestions for other information you’d like to see on this weekly = status update, let us know!]

 

Thanks,

 

Stephen K. Jolley<= o:p>

Yocto = Project Project Manager

(    Cell:         = ;       (208) = 244-4460

* Email:           = ;   sjolley.yp.pm@gmail.com

 

------=_NextPart_000_07D0_01D54C30.E0CBC710--