From mboxrd@z Thu Jan 1 00:00:00 1970 Received: from mail-pl1-f170.google.com (mail-pl1-f170.google.com [209.85.214.170]) by mx.groups.io with SMTP id smtpd.web10.13179.1589899858920307728 for ; Tue, 19 May 2020 07:50:59 -0700 Authentication-Results: mx.groups.io; dkim=pass header.i=@gmail.com header.s=20161025 header.b=qfdTxGD0; spf=pass (domain: gmail.com, ip: 209.85.214.170, mailfrom: sjolley.yp.pm@gmail.com) Received: by mail-pl1-f170.google.com with SMTP id m7so5732352plt.5 for ; Tue, 19 May 2020 07:50:58 -0700 (PDT) DKIM-Signature: v=1; a=rsa-sha256; c=relaxed/relaxed; d=gmail.com; s=20161025; h=from:to:subject:date:message-id:mime-version:thread-index :content-language; bh=At9ffFNToSNpUcXTWd6HRu9gGaqhtXXO3LfvM/pJbNY=; b=qfdTxGD0kBcCRNooMyDWztySknKzS76jTmrO4NwbHjh8AwEe0JvxkgpXGywv2h9yff 38Dsj7y5ejC5JaoNxCDTSpNsDdVjubTZaTIWe84mLIqvhLihYDkrXkRJJu+DI1h2BeTE OE18gloq+WIAaXiNY14yD0s5/Xa2I4+A4lHRYBIwkM40J8Ip/lLtv96PQVxCM+lSOz34 BALqEKJm7xqvWOhdSSUilZsnqr8t75Ve282WxOHOzcw/gIXe0o4i/Kvy9D7HaDSbNmDn eRpkEfmSKAhqDlHYtso8vHyS6PU0cgxJTs3HlU1HQuaNu9vVO/xARG+t8kVeZmBA/u9c J+Sw== X-Google-DKIM-Signature: v=1; a=rsa-sha256; c=relaxed/relaxed; d=1e100.net; s=20161025; h=x-gm-message-state:from:to:subject:date:message-id:mime-version :thread-index:content-language; bh=At9ffFNToSNpUcXTWd6HRu9gGaqhtXXO3LfvM/pJbNY=; b=RalRZAIHsUgF6vMiX4gby/AEb42muMl2a52y+BS8tQdVaK5ACds9l+7l7dmPpft+n+ BTnXJjjpwPvSrrTl/2PT/EiHGkwYy9PV0cWjnyYlMOZ7USo1RlqoYQp6D3lU3JSG7+JG sWTTH1mDj73ygkuQA3fq9Xcm+7KhZhjnNLhMLEzVQik3WbvZSpdWNQjNeND88IaFrKfr oBeGug7DOL5mPjHTLbWhM4GZseOn6ejhRf8ffDWcVfeJbNLOduzJNuC934RJ5vtouukL IL1kuzk5drFHrgMRJuSAQ60hIhpAsadkZSyRmfksosaem0ER9XT6GHTPycahiBl5Ydhp 7thw== X-Gm-Message-State: AOAM530YLqizKNGhG3V/Ubf0ZQUigWTN0Z6MoFhyPZqPU+buSEnuk1Ua /fTig+V2b+2+rVs0ds0DHPU= X-Google-Smtp-Source: ABdhPJyA7agS6YmMslA7/NUwJE6H2p9kQFb0UbeeJG3+Vm7FOH2TkrKCzHHoFOELPwR53wbWlXwpNg== X-Received: by 2002:a17:90a:b10e:: with SMTP id z14mr5715924pjq.57.1589899858401; Tue, 19 May 2020 07:50:58 -0700 (PDT) Return-Path: Received: from skjolley (c-71-59-136-149.hsd1.or.comcast.net. [71.59.136.149]) by smtp.gmail.com with ESMTPSA id d124sm11476235pfa.98.2020.05.19.07.50.57 (version=TLS1_2 cipher=ECDHE-ECDSA-AES128-GCM-SHA256 bits=128/128); Tue, 19 May 2020 07:50:57 -0700 (PDT) From: "Stephen Jolley" To: , Subject: Yocto Project Status WW20'20 Date: Tue, 19 May 2020 07:50:57 -0700 Message-ID: <179e01d62dec$e8206fe0$b8614fa0$@gmail.com> MIME-Version: 1.0 X-Mailer: Microsoft Outlook 16.0 Thread-Index: AdYt7OeGg+ECThfDQleRIJBKiFHjxw== Content-Type: multipart/alternative; boundary="----=_NextPart_000_179F_01D62DB2.3BC6EF10" Content-Language: en-us ------=_NextPart_000_179F_01D62DB2.3BC6EF10 Content-Type: text/plain; charset="us-ascii" Content-Transfer-Encoding: 7bit Current Dev Position: YP 3.2 M1 Next Deadline: YP 3.2 M1 build date 2020/6/16 Next Team Meetings: * Bug Triage meeting Thursday May 21st at 7:30am PDT ( https://zoom.us/j/454367603) * Monthly Project Meeting Tuesday June 2nd at 8am PDT ( https://zoom.us/j/990892712) * Weekly Engineering Sync Tuesday May 19th at 8am PDT ( https://zoom.us/j/990892712) * Twitch - See http://www.twitch.tv/letoatreidesthe2nd Key Status/Updates: * YP 3.0.3 is in QA and due out on 21st May * Gcc 10 merged to master, with the 'no-common' default change disabled for now whilst we address the other gcc 10 issues first, then we'll loop back to that. * We are struggling with autobuilder infrastructure problems, in particular with NFS locking but also with cancelled builds not terminating correctly. These are having a significant negative impact on master and all stable builds and are a significant concern as there is no clear path forward to any resolution. * Patches continue to merge into master but at a slower rate than normal. The patch submission rate has dropped slightly which has helped ensure there isn't a huge backlog. * We're moving the AUH job functionality to the autobuilder and integrating it there which should mean it's easier to reproduce its functionality and allows more people to see what it's doing and work on/with it. This should also reduce hosting costs. YP 3.2 Milestone Dates: * YP 3.2 M1 build date 2020/6/16 * YP 3.2 M1 Release date 2020/6/26 * YP 3.2 M2 build date 2020/7/27 * YP 3.2 M2 Release date 2020/8/7 * YP 3.2 M3 build date 2020/8/31 * YP 3.2 M3 Release date 2020/9/11 * YP 3.2 M4 build date 2020/10/5 * YP 3.2 M4 Release date 2020/10/30 Planned upcoming dot releases: * YP 3.0.3 is In QA * YP 3.0.3 release date 2020/5/15 * YP 2.7.4 build date 2020/5/18 * YP 2.7.4 release date 2020/5/29 * YP 3.1.1 build date 2020/6/29 * YP 3.1.1 release date 2020/7/10 * YP 3.0.4 build date 2020/8/10 * YP 3.0.4 release date 2020/8/21 * YP 3.1.2 build date 2020/9/14 * YP 3.1.2 release date 2020/9/25 Tracking Metrics: * WDD 2577 (last week 2577) ( https://wiki.yoctoproject.org/charts/combo.html) * Poky Patch Metrics * Total patches found: 1352 (last week 1345) * Patches in the Pending State: 537 (40%) [last week 536 (40%)] The Yocto Project's technical governance is through its Technical Steering Committee, more information is available at: https://wiki.yoctoproject.org/wiki/TSC The Status reports are now stored on the wiki at: https://wiki.yoctoproject.org/wiki/Weekly_Status [If anyone has suggestions for other information you'd like to see on this weekly status update, let us know!] Thanks, Stephen K. Jolley Yocto Project Program Manager * Cell: (208) 244-4460 * Email: sjolley.yp.pm@gmail.com ------=_NextPart_000_179F_01D62DB2.3BC6EF10 Content-Type: text/html; boundary="----=_NextPart_000_45D2_01D62831.6C4973F0"; charset="us-ascii" Content-Transfer-Encoding: quoted-printable

Current Dev = Position: YP 3.2 M1

Next Deadline: YP = 3.2 M1 build date 2020/6/16

 

Next Team = Meetings:

 

Key = Status/Updates:

  • YP 3.0.3 is in QA and due out = on 21st May
  • Gcc 10 merged to master, with = the ‘no-common’ default change disabled for now whilst we = address the other gcc 10 issues first, then we’ll loop back to = that.
  • We are struggling with = autobuilder infrastructure problems, in particular with NFS locking but = also with cancelled builds not terminating correctly. These are having a = significant negative impact on master and all stable builds and are a = significant concern as there is no clear path forward to any = resolution.
  • Patches continue to merge into = master but at a slower rate than normal. The patch submission rate has = dropped slightly which has helped ensure there isn’t a huge = backlog.
  • We’re moving the AUH job = functionality to the autobuilder and integrating it there which should = mean it's easier to reproduce its functionality and allows more people = to see what it's doing and work on/with it. This should also reduce = hosting costs.

 

YP 3.2 Milestone = Dates:

  • YP 3.2 M1 build date = 2020/6/16
  • YP 3.2 M1 Release date = 2020/6/26
  • YP 3.2 M2 build date = 2020/7/27
  • YP 3.2 M2 Release date = 2020/8/7
  • YP 3.2 M3 build date = 2020/8/31
  • YP 3.2 M3 Release date = 2020/9/11
  • YP 3.2 M4 build date = 2020/10/5
  • YP 3.2 M4 Release date = 2020/10/30

 

Planned upcoming = dot releases:

  • YP 3.0.3 is In = QA
  • YP 3.0.3 release date = 2020/5/15
  • YP 2.7.4 build date = 2020/5/18
  • YP 2.7.4 release date = 2020/5/29
  • YP 3.1.1 build date = 2020/6/29
  • YP 3.1.1 release date = 2020/7/10
  • YP 3.0.4 build date = 2020/8/10
  • YP 3.0.4 release date = 2020/8/21
  • YP 3.1.2 build date = 2020/9/14
  • YP 3.1.2 release date = 2020/9/25

 

Tracking = Metrics:

 

The Yocto = Project’s technical governance is through its Technical Steering = Committee, more information is available at:

https://wiki.yocto= project.org/wiki/TSC

 

The Status reports = are now stored on the wiki at: https://wiki.yocto= project.org/wiki/Weekly_Status

 

[If anyone has = suggestions for other information you’d like to see on this weekly = status update, let us know!]

 

Thanks,

 

Stephen K. Jolley<= o:p>

Yocto = Project Program Manager

(    Cell:         = ;       (208) = 244-4460

* Email:           = ;   sjolley.yp.pm@gmail.com

 

------=_NextPart_000_179F_01D62DB2.3BC6EF10--