From mboxrd@z Thu Jan 1 00:00:00 1970 Return-Path: Received: from mga09.intel.com (mga09.intel.com [134.134.136.24]) by mail.openembedded.org (Postfix) with ESMTP id 9C0CF606D0 for ; Fri, 15 Jul 2016 15:32:37 +0000 (UTC) Received: from orsmga001.jf.intel.com ([10.7.209.18]) by orsmga102.jf.intel.com with ESMTP; 15 Jul 2016 08:32:37 -0700 X-ExtLoop1: 1 X-IronPort-AV: E=Sophos;i="5.28,368,1464678000"; d="scan'208,217";a="995978346" Received: from swold-mobl2.jf.intel.com ([10.255.93.103]) by orsmga001.jf.intel.com with ESMTP; 15 Jul 2016 08:32:37 -0700 Message-ID: <1468596746.6912.772.camel@linux.intel.com> From: Saul Wold To: Yocto Discussion , OpenEmbedded List Date: Fri, 15 Jul 2016 08:32:26 -0700 X-Mailer: Evolution 3.18.5.2 (3.18.5.2-1.fc23) Mime-Version: 1.0 Subject: Yocto Project Status WW29 X-BeenThere: openembedded-core@lists.openembedded.org X-Mailman-Version: 2.1.12 Precedence: list List-Id: Patches and discussions about the oe-core layer List-Unsubscribe: , List-Archive: List-Post: List-Help: List-Subscribe: , X-List-Received-Date: Fri, 15 Jul 2016 15:32:39 -0000 Content-Type: multipart/alternative; boundary="=-Ab4wBw8eIKnDPNXCXSnh" --=-Ab4wBw8eIKnDPNXCXSnh Content-Type: text/plain; charset="UTF-8" Content-Transfer-Encoding: 8bit Current Dev Position: YP 2.2 M2 Next Deadline: YP 2.2 M2 cut off would be: 7/18/16 (This coming Monday - 5:00pm GMT) SWAT team rotation: Paul -> Ross https://wiki.yoctoproject.org/wiki/Yoct o_Build_Failure_Swat_Team Key Status/Updates: * Richard has been out this week, so the report will be thin. * Performance regressions were narrowed down to the GCC6 Update, movingto GTK3 and the Python3 port. Investigation into how to mitigate thisis ongoing. * We’re considering removing uclibc and GCC 5.4 (preferring musl and GCC6) from OE Core 2.2, so if this would impact you please speak up. * 2.1.1 Completed QA, but there was a High found to do with supportingFedora 24, which released very soon after 2.1 initially released andshould be a supported build host. This will delay 2.1.1 until after M2QA is completed. * Reminder that the M2 cut off is this coming Monday! Key YP 2.2 Dates: * YP 2.2 M1 release would be: 6/24/16 * YP 2.2 M2 cut off would be: 7/18/16 * YP 2.2 M2 release would be: 7/29/16 * YP 2.2 M3 cut off would be: 8/29/16 * YP 2.2 M3 release would be: 9/9/16 * YP 2.2 M4 cut off would be: 10/3/16 * YP 2.2 M4 release would be: 10/28/16 Tracking Metrics: WDD 2698 (last week 2747) (https://wiki.yoctoproject.org/charts/combo.html) Key Status Links for YP: https://wiki.yoctoproject.org/wiki/Yocto_Project_v2.2_Status https://wiki.yoctoproject.org/wiki/Yocto_2.2_Schedule https://wiki.yoctoproject.org/wiki/Yocto_2.2_Features [If anyone has suggestions for other information you’d like to see on this weekly status update, let us know!] --=-Ab4wBw8eIKnDPNXCXSnh Content-Type: text/html; charset="utf-8" Content-Transfer-Encoding: quoted-printable

Current Dev Pos= ition: YP 2.2 M2

Next Deadline: YP 2.2 M2 cu= t off would be: 7/18/16 (This coming Monday - 5:00pm GMT)


SWAT team rotation: Paul -> Ross

https://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team=


Key Status/Updates:

  • Richard has been out this wee= k, so the report will be thin.

  • Performance regress= ions were narrowed down to the GCC6 Update, moving to GTK3 and the Python3 = port. Investigation into how to mitigate this is ongoing.

  • We=E2=80=99re considering removing uclibc and GCC 5.4 (preferring m= usl and GCC 6) from OE Core 2.2, so if this would impact you please speak u= p.

  • 2.1.1 Completed QA, but there was a High found = to do with supporting Fedora 24, which released very soon after 2.1 initial= ly released and should be a supported build host. This will delay 2.1.1 unt= il after M2 QA is completed.

  • <= p dir=3D"ltr" style=3D"line-height:1.38;margin-top:0pt;margin-bottom:0pt;">= Reminder that the M2 = cut off is this coming Monday!


Key YP 2.2 Dates:

  • YP 2.2 M1 release would be: 6/24/16

  • YP= 2.2 M2 cut off would be: 7/18/16

  • YP 2.2 M2 releas= e would be: 7/29/16

  • YP 2.2 M3 cut off would be: 8/= 29/16

  • YP 2.2 M3 release would be: 9/9/16

  • YP 2.2 M4 cut off would be: 10/3/16

  • YP 2.2 M4 release would be: 10/28/16


Tracking Metrics:

(https://wiki.yoctoproject.org/charts/combo.html)


Key Status Links for YP:<= /span>

https://wiki.yoctoproject.org/wiki/Yocto_Project_v2.2_= Status

https://wiki.yoctoproject.org/wiki/Yocto_2.2_Sched= ule

https://wiki.yoctoproject.org/wiki/Yocto_2.2_Features=


[If anyone has suggestions for othe= r information you=E2=80=99d like to see on this weekly status update, let u= s know!]


--=-Ab4wBw8eIKnDPNXCXSnh-- From mboxrd@z Thu Jan 1 00:00:00 1970 Return-Path: Received: from mail-pa0-f65.google.com (mail-pa0-f65.google.com [209.85.220.65]) by mail.openembedded.org (Postfix) with ESMTP id BEB2E606D0 for ; Fri, 15 Jul 2016 15:47:57 +0000 (UTC) Received: by mail-pa0-f65.google.com with SMTP id dx3so6329024pab.2 for ; Fri, 15 Jul 2016 08:47:58 -0700 (PDT) DKIM-Signature: v=1; a=rsa-sha256; c=relaxed/relaxed; d=gmail.com; s=20120113; h=subject:to:references:from:message-id:date:user-agent:mime-version :in-reply-to:content-transfer-encoding; bh=2apEiWA8UtgE5+KiEeC4aeYlwywJpB0OYDwrqKOluK4=; b=xf6sme2wQclhXgkr3g7Ub+3bR81zOa2qFsf4N1mBf1hyuLdELHdHid1qUBMTVEFpjx aL26omCvSviq854dof/tFVTQ3t4ohAi+D9xkWE41YLZk2TlDMdok3xh9QDL0Z3UJE1VX uPNBLDNn9UJGspJV652CXIHFo5jACHbEkPJvDjizJCbmDcH2tG5T86rDrEm8dsInnt6M Zus8DnosJGZUkzgJF65kiK9H0XYK/F9zBLfPzx6s/y85suTgde+pvppNTeOogd4e55R/ nmOAVUxjRAwffUcWqU2uStn62sYWLmPkyw7xH0D2VHN8YxK3SrogbQp0ZXapf6MVlsMY 7wiQ== X-Google-DKIM-Signature: v=1; a=rsa-sha256; c=relaxed/relaxed; d=1e100.net; s=20130820; h=x-gm-message-state:subject:to:references:from:message-id:date :user-agent:mime-version:in-reply-to:content-transfer-encoding; bh=2apEiWA8UtgE5+KiEeC4aeYlwywJpB0OYDwrqKOluK4=; b=Mm91LErPm720E4+9veyTwMR5BLgt82TXn1rNnM7fvhpFv4ZVkfHXGqSkggSp4nrOUf rxJ0+Cit2N+hpOUX+ojhNE1ApwVaB5etbk0wUgmRa3APl9k0Rxju6K0FNbJKcO6naWoi PrMZQaSaKcGGDQf11znI1eCUrPsJ7I2fqNSpBqpmf8W4zOADAVbltuqzKM4AbEj3F5cA X7RN6XVKzjG+eHYF1IP+I0N6oVghppP4vyesGq8f/8gOasdoMd+KoUrw5YMu2N2Qy0et Xi4oc/r9/e3nzOjvNIk23C+9wghP19FHJk6KwDS14JCrbc/q+FEqGDh0VaKKbGwOKIhj BEvA== X-Gm-Message-State: ALyK8tJqeEisAByrhWMv5eLd/qu9nPz73BiPZL+wk2BAYNKOm2yy23CTY5jBYBz09HKz0w== X-Received: by 10.66.170.44 with SMTP id aj12mr33047320pac.131.1468597678471; Fri, 15 Jul 2016 08:47:58 -0700 (PDT) Received: from ?IPv6:2601:202:4001:9ea0:194d:2232:d2ef:3b9c? ([2601:202:4001:9ea0:194d:2232:d2ef:3b9c]) by smtp.googlemail.com with ESMTPSA id lf11sm5644055pab.17.2016.07.15.08.47.56 (version=TLS1_2 cipher=ECDHE-RSA-AES128-GCM-SHA256 bits=128/128); Fri, 15 Jul 2016 08:47:57 -0700 (PDT) To: Saul Wold , Yocto Discussion , OpenEmbedded List References: <1468596746.6912.772.camel@linux.intel.com> From: akuster808 Message-ID: <578905AB.4090701@gmail.com> Date: Fri, 15 Jul 2016 08:47:55 -0700 User-Agent: Mozilla/5.0 (X11; Linux x86_64; rv:38.0) Gecko/20100101 Thunderbird/38.8.0 MIME-Version: 1.0 In-Reply-To: <1468596746.6912.772.camel@linux.intel.com> Subject: Re: [yocto] Yocto Project Status WW29 X-BeenThere: openembedded-core@lists.openembedded.org X-Mailman-Version: 2.1.12 Precedence: list List-Id: Patches and discussions about the oe-core layer List-Unsubscribe: , List-Archive: List-Post: List-Help: List-Subscribe: , X-List-Received-Date: Fri, 15 Jul 2016 15:48:01 -0000 Content-Type: text/plain; charset=windows-1252 Content-Transfer-Encoding: 8bit On 07/15/2016 08:32 AM, Saul Wold wrote: > > Current Dev Position: YP 2.2 M2 > Next Deadline: YP 2.2 M2 cut off would > be: 7/18/16 (This coming Monday - 5:00pm GMT) > > SWAT team rotation: Paul -> Ross > https://wiki.yoctoproject.org/wiki/Yoct > o_Build_Failure_Swat_Team > > Key Status/Updates: > * Richard has been out this week, so the report will be thin. > * Performance regressions were narrowed down to the GCC6 Update, movingto GTK3 and the Python3 port. Investigation into how to mitigate thisis ongoing. > * We’re considering removing uclibc and GCC 5.4 (preferring musl and GCC6) from OE Core 2.2, so if this would impact you please speak up. > * 2.1.1 Completed QA, but there was a High found to do with supportingFedora 24, which released very soon after 2.1 initially released andshould be a supported build host. This will delay 2.1.1 until after M2QA is completed. Any idea on an ETA on M2QA will start. Since 2.1.1 is being delayed, does that open the door for more back ports not related to the F24 fixes ? - armin > * Reminder that the M2 cut off is this coming Monday! > > Key YP 2.2 Dates: > * YP 2.2 M1 release would be: 6/24/16 > * YP 2.2 M2 cut off would be: 7/18/16 > * YP 2.2 M2 release would be: 7/29/16 > * YP 2.2 M3 cut off would be: 8/29/16 > * YP 2.2 M3 release would be: 9/9/16 > * YP 2.2 M4 cut off would be: 10/3/16 > * YP 2.2 M4 release would be: 10/28/16 > > Tracking Metrics: > WDD 2698 (last week 2747) > (https://wiki.yoctoproject.org/charts/combo.html) > > Key Status Links for YP: > https://wiki.yoctoproject.org/wiki/Yocto_Project_v2.2_Status > https://wiki.yoctoproject.org/wiki/Yocto_2.2_Schedule > https://wiki.yoctoproject.org/wiki/Yocto_2.2_Features > > [If anyone has suggestions for other information you’d like to see on this weekly status update, let us know!] > > > >