* Patch "sched/deadline: Zero out positive runtime after throttling constrained tasks" has been added to the 4.9-stable tree
@ 2018-01-19 7:54 gregkh
0 siblings, 0 replies; only message in thread
From: gregkh @ 2018-01-19 7:54 UTC (permalink / raw)
To: xlpang, ben.hutchings, bristot, efault, gregkh, juri.lelli,
luca.abeni, mingo, peterz, rostedt, tglx, torvalds
Cc: stable, stable-commits
This is a note to let you know that I've just added the patch titled
sched/deadline: Zero out positive runtime after throttling constrained tasks
to the 4.9-stable tree which can be found at:
http://www.kernel.org/git/?p=linux/kernel/git/stable/stable-queue.git;a=summary
The filename of the patch is:
sched-deadline-zero-out-positive-runtime-after-throttling-constrained-tasks.patch
and it can be found in the queue-4.9 subdirectory.
If you, or anyone else, feels it should not be added to the stable tree,
please let <stable@vger.kernel.org> know about it.
>From ae83b56a56f8d9643dedbee86b457fa1c5d42f59 Mon Sep 17 00:00:00 2001
From: Xunlei Pang <xlpang@redhat.com>
Date: Wed, 10 May 2017 21:03:37 +0800
Subject: sched/deadline: Zero out positive runtime after throttling constrained tasks
From: Xunlei Pang <xlpang@redhat.com>
commit ae83b56a56f8d9643dedbee86b457fa1c5d42f59 upstream.
When a contrained task is throttled by dl_check_constrained_dl(),
it may carry the remaining positive runtime, as a result when
dl_task_timer() fires and calls replenish_dl_entity(), it will
not be replenished correctly due to the positive dl_se->runtime.
This patch assigns its runtime to 0 if positive after throttling.
Signed-off-by: Xunlei Pang <xlpang@redhat.com>
Signed-off-by: Peter Zijlstra (Intel) <peterz@infradead.org>
Acked-by: Daniel Bristot de Oliveira <bristot@redhat.com>
Cc: Juri Lelli <juri.lelli@arm.com>
Cc: Linus Torvalds <torvalds@linux-foundation.org>
Cc: Luca Abeni <luca.abeni@santannapisa.it>
Cc: Mike Galbraith <efault@gmx.de>
Cc: Peter Zijlstra <peterz@infradead.org>
Cc: Steven Rostedt <rostedt@goodmis.org>
Cc: Thomas Gleixner <tglx@linutronix.de>
Fixes: df8eac8cafce ("sched/deadline: Throttle a constrained deadline task activated after the deadline)
Link: http://lkml.kernel.org/r/1494421417-27550-1-git-send-email-xlpang@redhat.com
Signed-off-by: Ingo Molnar <mingo@kernel.org>
Cc: Ben Hutchings <ben.hutchings@codethink.co.uk>
Signed-off-by: Greg Kroah-Hartman <gregkh@linuxfoundation.org>
---
kernel/sched/deadline.c | 2 ++
1 file changed, 2 insertions(+)
--- a/kernel/sched/deadline.c
+++ b/kernel/sched/deadline.c
@@ -723,6 +723,8 @@ static inline void dl_check_constrained_
if (unlikely(dl_se->dl_boosted || !start_dl_timer(p)))
return;
dl_se->dl_throttled = 1;
+ if (dl_se->runtime > 0)
+ dl_se->runtime = 0;
}
}
Patches currently in stable-queue which might be from xlpang@redhat.com are
queue-4.9/sched-deadline-zero-out-positive-runtime-after-throttling-constrained-tasks.patch
^ permalink raw reply [flat|nested] only message in thread
only message in thread, other threads:[~2018-01-19 7:54 UTC | newest]
Thread overview: (only message) (download: mbox.gz follow: Atom feed
-- links below jump to the message on this page --
2018-01-19 7:54 Patch "sched/deadline: Zero out positive runtime after throttling constrained tasks" has been added to the 4.9-stable tree gregkh
This is a public inbox, see mirroring instructions
for how to clone and mirror all data and code used for this inbox;
as well as URLs for NNTP newsgroup(s).