From mboxrd@z Thu Jan 1 00:00:00 1970 Received: from yocto-www.yoctoproject.org (yocto-www.yoctoproject.org [140.211.169.56]) by mx.groups.io with SMTP id smtpd.web10.1181.1588085141768028255 for ; Tue, 28 Apr 2020 07:45:41 -0700 Authentication-Results: mx.groups.io; dkim=pass header.i=@gmail.com header.s=20161025 header.b=Qrg+NqV4; spf=softfail (domain: gmail.com, ip: 140.211.169.56, mailfrom: sjolley.yp.pm@gmail.com) Received: by yocto-www.yoctoproject.org (Postfix, from userid 118) id 6FE34E019FC; Tue, 28 Apr 2020 07:45:41 -0700 (PDT) X-Spam-Checker-Version: SpamAssassin 3.3.1 (2010-03-16) on yocto-www.yoctoproject.org X-Spam-Level: X-Spam-Status: No, score=-2.0 required=5.0 tests=BAYES_00,DKIM_SIGNED, DKIM_VALID,DKIM_VALID_AU,FREEMAIL_FROM,HTML_MESSAGE,RCVD_IN_DNSWL_NONE autolearn=ham version=3.3.1 X-Spam-HAM-Report: * -1.9 BAYES_00 BODY: Bayes spam probability is 0 to 1% * [score: 0.0000] * 0.0 FREEMAIL_FROM Sender email is commonly abused enduser mail provider * (sjolley.yp.pm[at]gmail.com) * -0.0 RCVD_IN_DNSWL_NONE RBL: Sender listed at https://www.dnswl.org/, no * trust * [209.85.215.194 listed in list.dnswl.org] * 0.0 HTML_MESSAGE BODY: HTML included in message * -0.1 DKIM_VALID_AU Message has a valid DKIM or DK signature from author's * domain * -0.1 DKIM_VALID Message has at least one valid DKIM or DK signature * 0.1 DKIM_SIGNED Message has a DKIM or DK signature, not necessarily * valid Received: from mail-pg1-f194.google.com (mail-pg1-f194.google.com [209.85.215.194]) by yocto-www.yoctoproject.org (Postfix) with ESMTP id 0FC9AE019CB for ; Tue, 28 Apr 2020 07:45:38 -0700 (PDT) Received: by mail-pg1-f194.google.com with SMTP id n11so2313361pgl.9 for ; Tue, 28 Apr 2020 07:45:38 -0700 (PDT) DKIM-Signature: v=1; a=rsa-sha256; c=relaxed/relaxed; d=gmail.com; s=20161025; h=from:to:subject:date:message-id:mime-version:thread-index :content-language; bh=8cdjDp5crV+4Warl7Yji6WogZ9rpArK1MQ5nOzhIWZ8=; b=Qrg+NqV4W14Vwp2JjvD7PyKlKt2oSOSlMWG752wbJsWx9hlkd680tB9a3KUkTyaAhN OdshuK7v2ZqmmUeXQ232AjmAHnKwKkiI1UnWXh8HOHfLX6JXL4FVeje/QM4xjy3dz1jW S1qtQNuwQjR59U2UfvNqk4LSPuayddrW+5DbqyuIaw/88Y4ZbrbNn+UICN44Bl0Y86gU hCRQxHdpuNkmQRXtqj8vkZwnMO3lXvC1L4OQG6f7Jb7I8GLgxzGxxWwzIo59DSvu3liH YBsEdwYXsa7wGtxytquxeX9FjkIIcJ5g0YJy6CkWZaf+pNeXoCxrUhk/4qWgjV+ApmTn 1+Bw== X-Google-DKIM-Signature: v=1; a=rsa-sha256; c=relaxed/relaxed; d=1e100.net; s=20161025; h=x-gm-message-state:from:to:subject:date:message-id:mime-version :thread-index:content-language; bh=8cdjDp5crV+4Warl7Yji6WogZ9rpArK1MQ5nOzhIWZ8=; b=H0k+xvaViw3tzTrg5MeZEau544zmZMN55AfyupXf/8CUo56x9kjLQZopGPIC8X7duc lgzGMcGG2CyBk6gpV4yn60eWp068tWw1pgLPNThLQeOgwdLb7cirmwK3GkB4xdOkTv7z nWSCb7/U3hql6Bpyj7N40VJGvvoPVznRqgol0q/ERc8eoavG7DIr9yOsCc7YJI9OlbJo JZuoKP4o8c1VMBycjxdjHVHkkTS93d4kgM85VAmAZDhCIzFKxvdEcp8wMFdDDQ23S4Jx GIBJ4wD4KJSY1shZZc+Kv/eBa+xY2vxDsm70+Fm/SU3Vx1z5bKEdIgtbYnSe+WKzryX7 NkqA== X-Gm-Message-State: AGi0PubMeT5i1gh39AsRGYAtkKjTcjBhBK1zDSzq4V1wQyy0jT0jfbV7 J6qxhBTigG0ljX3tiarVQgI= X-Google-Smtp-Source: APiQypIiqFIKCcLZ2xIo5ZMYaJgSD1ttkx4G4eRiXYaDd4oJN4lxY2IZ2O+3l8bjs31LDUy/cvasWg== X-Received: by 2002:a63:600c:: with SMTP id u12mr25225941pgb.318.1588085138397; Tue, 28 Apr 2020 07:45:38 -0700 (PDT) Received: from skjolley (c-71-59-136-149.hsd1.or.comcast.net. [71.59.136.149]) by smtp.gmail.com with ESMTPSA id h8sm1776890pfo.143.2020.04.28.07.45.36 (version=TLS1_2 cipher=ECDHE-ECDSA-AES128-GCM-SHA256 bits=128/128); Tue, 28 Apr 2020 07:45:37 -0700 (PDT) From: "Stephen Jolley" To: , Subject: Yocto Project Status WW17'20 Date: Tue, 28 Apr 2020 07:45:37 -0700 Message-ID: <114201d61d6b$aea407e0$0bec17a0$@gmail.com> MIME-Version: 1.0 X-Mailer: Microsoft Outlook 16.0 Thread-Index: AdYda5YVaVzcQ6HjTpGY3CR+DB3bIg== Content-Type: multipart/alternative; boundary="----=_NextPart_000_1143_01D61D31.0249EAD0" Content-Language: en-us ------=_NextPart_000_1143_01D61D31.0249EAD0 Content-Type: text/plain; charset="US-ASCII" Content-Transfer-Encoding: 7bit Current Dev Position: YP 3.2 M1 Next Deadline: YP 3.2 M1 build date 2020/6/16 Next Team Meetings: * Bug Triage meeting Thursday Apr. 30th at 7:30am PDT ( https://zoom.us/j/454367603) * Monthly Project Meeting Tuesday May 5th at 8am PDT ( https://zoom.us/j/990892712) * Weekly Engineering Sync Tuesday Apr. 28th at 8am PDT ( https://zoom.us/j/990892712) * Twitch - See http://www.twitch.tv/letoatreidesthe2nd Key Status/Updates: * YP 3.1 was released, thanks to everyone who contributed! * The stable maintainer for the 3.1 LTS release is Steve Sakoman * YP 3.1 (dunfell) has been announced as an LTS release: https://www.yoctoproject.org/yocto-project-long-term-support-announced/ * Patches have started merging again into master. We've already had some challenging issues to debug with them on the autobuilder where the root cause turned out to be an underlying QA test code issue exposed by test ordering issues. * Master branch development will open up later this week, there are already some patches queued and tested in master-next * The multilib discussion on the openembedded-architecture list has continued with the potential of new bitbake support to better enable class extensions (which enable native and nativesdk variants as well as multilib). * We've identified some issues with the new buildtools-extended-tarball so we'll be making a new version of that and porting fixes to the stable branch. * We are aware of some issues with bug trend metrics this week due to server transitions and are working to resolve those. YP 3.2 Milestone Dates: * YP 3.2 M1 build date 2020/6/16 * YP 3.2 M1 Release date 2020/6/26 * YP 3.2 M2 build date 2020/7/27 * YP 3.2 M2 Release date 2020/8/7 * YP 3.2 M3 build date 2020/8/31 * YP 3.2 M3 Release date 2020/9/11 * YP 3.2 M4 build date 2020/10/5 * YP 3.2 M4 Release date 2020/10/30 Planned upcoming dot releases: * YP 3.0.3 build date 2020/5/4 * YP 3.0.3 release date 2020/5/15 * YP 2.7.4 build date 2020/5/18 * YP 2.7.4 release date 2020/5/29 * YP 3.1.1 build date 2020/6/29 * YP 3.1.1 release date 2020/7/10 * YP 3.0.4 build date 2020/8/10 * YP 3.0.4 release date 2020/8/21 * YP 3.1.2 build date 2020/9/14 * YP 3.1.2 release date 2020/9/25 Tracking Metrics: * WDD 2577 (last week 2577) ( https://wiki.yoctoproject.org/charts/combo.html) * Poky Patch Metrics * Total patches found: 1367 (last week 1364) * Patches in the Pending State: 540 (40%) [last week 538 (39%)] The Yocto Project's technical governance is through its Technical Steering Committee, more information is available at: https://wiki.yoctoproject.org/wiki/TSC The Status reports are now stored on the wiki at: https://wiki.yoctoproject.org/wiki/Weekly_Status [If anyone has suggestions for other information you'd like to see on this weekly status update, let us know!] Thanks, Stephen K. Jolley Yocto Project Program Manager * Cell: (208) 244-4460 * Email: sjolley.yp.pm@gmail.com ------=_NextPart_000_1143_01D61D31.0249EAD0 Content-Type: text/html; boundary="----=_NextPart_000_1289_01D617B0.3F0C6C30"; charset="US-ASCII" Content-Transfer-Encoding: quoted-printable

Current Dev = Position: YP 3.2 M1

Next Deadline: YP = 3.2 M1 build date 2020/6/16

 

Next Team = Meetings:

 

Key = Status/Updates:

  • YP 3.1 was released, thanks to = everyone who contributed!
  • The stable maintainer for the = 3.1 LTS release is Steve Sakoman
  • YP 3.1 (dunfell) has been = announced as an LTS release: https://www.yoctoproject.org/yocto-project-long-t= erm-support-announced/
  • Patches have started merging = again into master. We’ve already had some challenging issues to = debug with them on the autobuilder where the root cause turned out to be = an underlying QA test code issue exposed by test ordering = issues.
  • Master branch development will = open up later this week, there are already some patches queued and = tested in master-next
  • The multilib discussion on the = openembedded-architecture list has continued with the potential of new = bitbake support to better enable class extensions (which enable native = and nativesdk variants as well as multilib).
  • We’ve identified some = issues with the new buildtools-extended-tarball so we’ll be making = a new version of that and porting fixes to the stable = branch.
  • We are aware of some issues = with bug trend metrics this week due to server transitions and are = working to resolve those.

 

YP 3.2 Milestone = Dates:

  • YP 3.2 M1 build date = 2020/6/16
  • YP 3.2 M1 Release date = 2020/6/26
  • YP 3.2 M2 build date = 2020/7/27
  • YP 3.2 M2 Release date = 2020/8/7
  • YP 3.2 M3 build date = 2020/8/31
  • YP 3.2 M3 Release date = 2020/9/11
  • YP 3.2 M4 build date = 2020/10/5
  • YP 3.2 M4 Release date = 2020/10/30

 

Planned upcoming = dot releases:

  • YP 3.0.3 build date = 2020/5/4
  • YP 3.0.3 release date = 2020/5/15
  • YP 2.7.4 build date = 2020/5/18
  • YP 2.7.4 release date = 2020/5/29
  • YP 3.1.1 build date = 2020/6/29
  • YP 3.1.1 release date = 2020/7/10
  • YP 3.0.4 build date = 2020/8/10
  • YP 3.0.4 release date = 2020/8/21
  • YP 3.1.2 build date = 2020/9/14
  • YP 3.1.2 release date = 2020/9/25

 

Tracking = Metrics:

 

The Yocto = Project’s technical governance is through its Technical Steering = Committee, more information is available at:

https://wiki.yocto= project.org/wiki/TSC

 

The Status reports = are now stored on the wiki at: https://wiki.yocto= project.org/wiki/Weekly_Status

 

[If anyone has = suggestions for other information you’d like to see on this weekly = status update, let us know!]

 

Thanks,

 

Stephen K. Jolley<= o:p>

Yocto = Project Program Manager

(    Cell:        = ;        (208) = 244-4460

* Email:          = ;    sjolley.yp.pm@gmail.com

 

------=_NextPart_000_1143_01D61D31.0249EAD0--