From mboxrd@z Thu Jan 1 00:00:00 1970 Received: from yocto-www.yoctoproject.org (yocto-www.yoctoproject.org [140.211.169.56]) by mx.groups.io with SMTP id smtpd.web10.52323.1590504227819621570 for ; Tue, 26 May 2020 07:43:47 -0700 Authentication-Results: mx.groups.io; dkim=pass header.i=@gmail.com header.s=20161025 header.b=tvQ8zx81; spf=softfail (domain: gmail.com, ip: 140.211.169.56, mailfrom: sjolley.yp.pm@gmail.com) Received: by yocto-www.yoctoproject.org (Postfix, from userid 118) id AA9BBE01BB9; Tue, 26 May 2020 07:43:47 -0700 (PDT) X-Spam-Checker-Version: SpamAssassin 3.3.1 (2010-03-16) on yocto-www.yoctoproject.org X-Spam-Level: X-Spam-Status: No, score=-2.0 required=5.0 tests=BAYES_00,DKIM_SIGNED, DKIM_VALID,DKIM_VALID_AU,FREEMAIL_FROM,HTML_MESSAGE,RCVD_IN_DNSWL_NONE, URIBL_RED autolearn=ham version=3.3.1 X-Spam-HAM-Report: * -1.9 BAYES_00 BODY: Bayes spam probability is 0 to 1% * [score: 0.0000] * 0.0 FREEMAIL_FROM Sender email is commonly abused enduser mail provider * (sjolley.yp.pm[at]gmail.com) * -0.0 RCVD_IN_DNSWL_NONE RBL: Sender listed at https://www.dnswl.org/, no * trust * [209.85.216.41 listed in list.dnswl.org] * 0.0 URIBL_RED Contains an URL listed in the URIBL redlist * [URIs: yoctoproject.org] * 0.0 HTML_MESSAGE BODY: HTML included in message * -0.1 DKIM_VALID_AU Message has a valid DKIM or DK signature from author's * domain * -0.1 DKIM_VALID Message has at least one valid DKIM or DK signature * 0.1 DKIM_SIGNED Message has a DKIM or DK signature, not necessarily * valid Received: from mail-pj1-f41.google.com (mail-pj1-f41.google.com [209.85.216.41]) by yocto-www.yoctoproject.org (Postfix) with ESMTP id 33CF7E01B6C for ; Tue, 26 May 2020 07:43:45 -0700 (PDT) Received: by mail-pj1-f41.google.com with SMTP id z15so54923pjb.0 for ; Tue, 26 May 2020 07:43:45 -0700 (PDT) DKIM-Signature: v=1; a=rsa-sha256; c=relaxed/relaxed; d=gmail.com; s=20161025; h=from:to:subject:date:message-id:mime-version:content-language :thread-index; bh=x+7fuHj59Wh3lxQwixiC8a/XwXM/gkwtWd9xZnwv24o=; b=tvQ8zx81nIjLgYLU+SH7faiRFKkfT5Zlr331fFd5nmmj1umkVE90J8t2+gB+nGkXS8 93VxMKtsD0MTNEMQebwWbcJkX0M86z2tp9qyoKW74LbUZWGp+0QADmiaXe4tbswVrIJg p3HiBs/345SKJbRDEfNrysaIpIsHSoxFI4tIS4uoAEsaOerBnWByWPPgFajJ9Vcp/RTJ 9ty34SpAXJ/zuv/atTFbVZeOAWtWSJxwB13qOVGoBZ+ClI34PHUig+1J0YDkZg6IhAY/ dIHivtmHjE70Anz+y4NWhUtmKksiPjh/7RBC7g/tnh41SOG5IXvf6ESr1AAxCt6wbb9Q 3/Lw== X-Google-DKIM-Signature: v=1; a=rsa-sha256; c=relaxed/relaxed; d=1e100.net; s=20161025; h=x-gm-message-state:from:to:subject:date:message-id:mime-version :content-language:thread-index; bh=x+7fuHj59Wh3lxQwixiC8a/XwXM/gkwtWd9xZnwv24o=; b=Z9deSnApYDjNHk5bYKMWV+U+d2rVKjMep4OCpQHZPbKN2NSIfbJwp77oaBSFG3IGJB xWLcFCIMjihnKv8VC2bC+mBLWSsbc4AsJkZwnDsNtK39/agIPwd5DyLUOO67BGZ0tb97 XFst92I3ZDflw8eYQ74YCdP1QkRhi3QuNKqdzdV4r+SJFfmw/3Bcy3Pku8rdmhf0Pn0V zINlWQPRmvutAaWC2FWOKKu5cXdVExp80rVefa9L5Q5wX2mk/eq3PC9ofTs03PTBvQ8O W671m4BO1zZYmhmOuEYR5/+ax6xBzFj3va6EbU/ljqQEOL+czuk/S1ER2X8kfPI+iK7K UppQ== X-Gm-Message-State: AOAM533v8/m/d7airEpdpkG+7msZJAIpc2p8ALiHduSyf+iTZvDU54Mm EgTHyXhv/tlMpQtU9kdq+cM= X-Google-Smtp-Source: ABdhPJw/x5vMpa3T0HqENjZyvu/m3iuKzoOPME9d/XQG3zbEef41cODLTwsTtXrRIn+p0Fs1DUav6Q== X-Received: by 2002:a17:90a:890b:: with SMTP id u11mr16225270pjn.233.1590504224640; Tue, 26 May 2020 07:43:44 -0700 (PDT) Received: from skjolley (c-71-59-136-149.hsd1.or.comcast.net. [71.59.136.149]) by smtp.gmail.com with ESMTPSA id l11sm40605pjj.33.2020.05.26.07.43.43 (version=TLS1_2 cipher=ECDHE-ECDSA-AES128-GCM-SHA256 bits=128/128); Tue, 26 May 2020 07:43:44 -0700 (PDT) From: "Stephen Jolley" To: , Subject: Yocto Project Status WW20'21 Date: Tue, 26 May 2020 07:43:43 -0700 Message-ID: <1daf01d6336c$0e776ac0$2b664040$@gmail.com> MIME-Version: 1.0 X-Mailer: Microsoft Outlook 16.0 Thread-Index: AdYza/yVFogso0dWTeC/6hMY6/gC/g== Content-Type: multipart/alternative; boundary="----=_NextPart_000_1DB0_01D63331.621E5F20" Content-Language: en-us ------=_NextPart_000_1DB0_01D63331.621E5F20 Content-Type: text/plain; charset="us-ascii" Content-Transfer-Encoding: 7bit Current Dev Position: YP 3.2 M1 Next Deadline: YP 3.2 M1 build date 2020/6/16 Next Team Meetings: * Bug Triage meeting Thursday May 28th at 7:30am PDT ( https://zoom.us/j/454367603) * Monthly Project Meeting Tuesday June 2nd at 8am PDT ( https://zoom.us/j/990892712) * Weekly Engineering Sync Tuesday May 26th at 8am PDT ( https://zoom.us/j/990892712) * Twitch - See http://www.twitch.tv/letoatreidesthe2nd Key Status/Updates: * YP 3.0.3 is in QA result review, there were ptest regressions but these look intermittent in nature and hence unlikely to block release * YP 2.7.4 should be built this week * One of the autobuilder issues where workers were hanging was tracked down to a NFS incompatibility between the NAS and new kernel versions. The NAS was upgraded to resolve this at a cost of some short notice downtime. * There remain a large number of bugs that we'd ideally like to fix in 3.2 M1 (or M2) but they are "unassigned", there is nobody to work on them. If anyone has time, looking at these bugs would be a great way to help us. See: https://wiki.yoctoproject.org/wiki/Bug_Triage#Medium.2B_3.2_Unassigned_Enhan cements.2FBugs * There continue to be other intermittent autobuilder issues in both master and dunfell which we're trying to track down. These ones look related to the code rather than infrastructure. * The AUH is now implemented as an autobuilder job and will be run from there in future. YP 3.2 Milestone Dates: * YP 3.2 M1 build date 2020/6/16 * YP 3.2 M1 Release date 2020/6/26 * YP 3.2 M2 build date 2020/7/27 * YP 3.2 M2 Release date 2020/8/7 * YP 3.2 M3 build date 2020/8/31 * YP 3.2 M3 Release date 2020/9/11 * YP 3.2 M4 build date 2020/10/5 * YP 3.2 M4 Release date 2020/10/30 Planned upcoming dot releases: * YP 3.0.3 is out of QA and the results are being reviewed. * YP 3.0.3 release date 2020/5/15 * YP 2.7.4 build date 2020/5/18 * YP 2.7.4 release date 2020/5/29 * YP 3.1.1 build date 2020/6/29 * YP 3.1.1 release date 2020/7/10 * YP 3.0.4 build date 2020/8/10 * YP 3.0.4 release date 2020/8/21 * YP 3.1.2 build date 2020/9/14 * YP 3.1.2 release date 2020/9/25 Tracking Metrics: * WDD 2577 (last week 2577) ( https://wiki.yoctoproject.org/charts/combo.html) * Poky Patch Metrics * Total patches found: 1351 (last week 1352) * Patches in the Pending State: 535 (40%) [last week 537 (40%)] The Yocto Project's technical governance is through its Technical Steering Committee, more information is available at: https://wiki.yoctoproject.org/wiki/TSC The Status reports are now stored on the wiki at: https://wiki.yoctoproject.org/wiki/Weekly_Status [If anyone has suggestions for other information you'd like to see on this weekly status update, let us know!] Thanks, Stephen K. Jolley Yocto Project Program Manager * Cell: (208) 244-4460 * Email: sjolley.yp.pm@gmail.com ------=_NextPart_000_1DB0_01D63331.621E5F20 Content-Type: text/html; boundary="----=_NextPart_000_179F_01D62DB2.3BC6EF10"; charset="us-ascii" Content-Transfer-Encoding: quoted-printable

Current Dev = Position: YP 3.2 M1

Next Deadline: YP = 3.2 M1 build date 2020/6/16

 

Next Team = Meetings:

 

Key = Status/Updates:

  • YP 3.0.3 is in QA result = review, there were ptest regressions but these look intermittent in = nature and hence unlikely to block release
  • YP 2.7.4 should be built this = week
  • One of the autobuilder issues = where workers were hanging was tracked down to a NFS incompatibility = between the NAS and new kernel versions. The NAS was upgraded to resolve = this at a cost of some short notice downtime.
  • There remain a large number of = bugs that we’d ideally like to fix in 3.2 M1 (or M2) but they are = “unassigned”, there is nobody to work on them. If anyone has = time, looking at these bugs would be a great way to help us. See: https://wiki.yoctoproject.org/wiki/Bug_Triage#Med= ium.2B_3.2_Unassigned_Enhancements.2FBugs
  • There continue to be other = intermittent autobuilder issues in both master and dunfell which = we’re trying to track down. These ones look related to the code = rather than infrastructure.
  • The AUH is now implemented as = an autobuilder job and will be run from there in = future.

 

YP 3.2 Milestone = Dates:

  • YP 3.2 M1 build date = 2020/6/16
  • YP 3.2 M1 Release date = 2020/6/26
  • YP 3.2 M2 build date = 2020/7/27
  • YP 3.2 M2 Release date = 2020/8/7
  • YP 3.2 M3 build date = 2020/8/31
  • YP 3.2 M3 Release date = 2020/9/11
  • YP 3.2 M4 build date = 2020/10/5
  • YP 3.2 M4 Release date = 2020/10/30

 

Planned upcoming = dot releases:

  • YP 3.0.3 is out of QA and the = results are being reviewed.
  • YP 3.0.3 release date = 2020/5/15
  • YP 2.7.4 build date = 2020/5/18
  • YP 2.7.4 release date = 2020/5/29
  • YP 3.1.1 build date = 2020/6/29
  • YP 3.1.1 release date = 2020/7/10
  • YP 3.0.4 build date = 2020/8/10
  • YP 3.0.4 release date = 2020/8/21
  • YP 3.1.2 build date = 2020/9/14
  • YP 3.1.2 release date = 2020/9/25

 

Tracking = Metrics:

 

The Yocto = Project’s technical governance is through its Technical Steering = Committee, more information is available at:

https://wiki.yocto= project.org/wiki/TSC

 

The Status reports = are now stored on the wiki at: https://wiki.yocto= project.org/wiki/Weekly_Status

 

[If anyone has = suggestions for other information you’d like to see on this weekly = status update, let us know!]

 

Thanks,

 

Stephen K. Jolley<= o:p>

Yocto = Project Program Manager