Current Dev Position: YP 2.7 M3 (New feature Freeze has begun.)

Next Deadline: YP 2.7 M3 Cutoff was Feb. 25, 2019

 

SWAT Team Rotation:

*	SWAT lead is currently: Ross
*	SWAT team rotation: Ross -> Chen on Mar. 1, 2019
*	SWAT team rotation: Chen -> Armin on Mar. 8, 2019
*	 <https://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team>
https://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team

 

Key Status/Updates:

*	We have now passed the feature freeze point for 2.7
*	YP 2.7 M2 rc2 is out of QA and being readied for release.  See:
<https://wiki.yoctoproject.org/wiki/WW07_-_2019-02-14_-_Full_Test_Cycle_2.7_
M2_RC2>
https://wiki.yoctoproject.org/wiki/WW07_-_2019-02-14_-_Full_Test_Cycle_2.7_M
2_RC2 and
<https://wiki.yoctoproject.org/wiki/Yocto_Project_v2.7_Status#Milestone_2_-_
Target_Feb._1.2C_2019>
https://wiki.yoctoproject.org/wiki/Yocto_Project_v2.7_Status#Milestone_2_-_T
arget_Feb._1.2C_2019
*	We now have resulttool, buildhistory and build-performance all
working with the autobuilder and will be using this as the primary QA
mechanism going forward. More details can be found here:

 
<http://lists.openembedded.org/pipermail/openembedded-architecture/2019-Febr
uary/001591.html>
http://lists.openembedded.org/pipermail/openembedded-architecture/2019-Febru
ary/001591.html

*	There were some serious usability issues found with multiconfig,
those have been fixed in master and thud.
*	Various recipe upgrades made it in, thanks to all who contributed.
Several recipes also converted to meson including glib-2.0 and gdk-pixbuf.
*	We now need to build M3 as we're past feature freeze point for 2.7.
Right now we're aware of the following things which ideally need to be
resolved first:

*	Bug 13178 "X server and matchbox desktop don't start up properly on
beaglebone" needs to be fixed
*	Find the framebuffer problem with qemuarmv7 and switch to that
*	Several ptest issues would be addressed (missing openssl tests, 3
timeouts)
*	Arm build host issues identified and resolved

*	It's unlikely we'll switch to virtgl by default for 2.7 due to lack
of testing from the community although the base patches for this have
merged.

 

Planned Releases for YP 2.7:

*	YP 2.7 M2 rc2 is out of QA.
*	YP 2.7 M2 Release Target was Feb. 1, 2019
*	YP 2.7 M3 Cutoff is Feb. 25, 2019
*	YP 2.7 M3 Release Target is Mar. 8, 2019
*	YP 2.7 M4 Cutoff is Apr. 1, 2019
*	YP 2.7 M4 Release Target is Apr. 26, 2019

 

Planned upcoming dot releases:

*	YP 2.5.3 (Sumo) will be targeted after YP 2.7 M2 is done.
*	YP 2.5.4 (Sumo) will be targeted after YP 2.7 M4 is done.
*	YP 2.6.2 (Thud) will be targeted after YP 2.5.4 is done.

 

Tracking Metrics:

*	WDD 2415 (last week 2392) (
<https://wiki.yoctoproject.org/charts/combo.html>
https://wiki.yoctoproject.org/charts/combo.html)
*	Poky Patch Metrics  

*	Total patches found: 1516 (last week 1527)
*	Patches in the Pending State: 660 (44%) [last week 663 (43%)]

 

Key Status Links for YP:

 <https://wiki.yoctoproject.org/wiki/Yocto_Project_v2.7_Status>
https://wiki.yoctoproject.org/wiki/Yocto_Project_v2.7_Status

 <https://wiki.yoctoproject.org/wiki/Yocto_2.7_Schedule>
https://wiki.yoctoproject.org/wiki/Yocto_2.7_Schedule

 <https://wiki.yoctoproject.org/wiki/Yocto_2.7_Features>
https://wiki.yoctoproject.org/wiki/Yocto_2.7_Features

 

The Status reports are now stored on the wiki at:
<https://wiki.yoctoproject.org/wiki/Weekly_Status>
https://wiki.yoctoproject.org/wiki/Weekly_Status

 

[If anyone has suggestions for other information you'd like to see on this
weekly status update, let us know!]

 

Thanks,

 

Stephen K. Jolley

Yocto Project Program Manager

*    Cell:                (208) 244-4460

* Email:              sjolley.yp.pm@gmail.com
<mailto:sjolley.yp.pm@gmail.com> 

 


[-- Attachment #2: Type: text/html, Size: 38557 bytes --]

^ permalink raw reply	[flat|nested] 2+ messages in thread

* Re: Yocto Project Status WW09'19
  2019-02-26 15:58 Yocto Project Status WW09'19 sjolley.yp.pm
@ 2019-03-02 23:01 ` akuster
  0 siblings, 0 replies; 2+ messages in thread
From: akuster @ 2019-03-02 23:01 UTC (permalink / raw)
  To: sjolley.yp.pm@gmail.com; +Cc: yocto

[-- Attachment #1: Type: text/plain, Size: 4042 bytes --]



On 2/26/19 7:58 AM, sjolley.yp.pm@gmail.com wrote:
>
> Current Dev Position: YP 2.7 M3 (New feature Freeze has begun.)
>
> Next Deadline: YP 2.7 M3 Cutoff was Feb. 25, 2019
>
>  
>
> SWAT Team Rotation:
>
>   * SWAT lead is currently: Ross
>   * SWAT team rotation: Ross -> Chen on Mar. 1, 2019
>   * SWAT team rotation: Chen -> Armin on Mar. 8, 2019
>
I am going to be at LS on Monday March 10th and traveling on March 13. 
If this may be an issue, maybe rescheduling for a different week may be
in order.
I personal don't this there will be an issue.

>  *
>
>
>   * https://wiki.yoctoproject.org/wiki/Yocto_Build_Failure_Swat_Team
>
>  
>
> Key Status/Updates:
>
>   * We have now passed the feature freeze point for 2.7
>   * YP 2.7 M2 rc2 is out of QA and being readied for release.  See:
>     https://wiki.yoctoproject.org/wiki/WW07_-_2019-02-14_-_Full_Test_Cycle_2.7_M2_RC2
>     and
>     https://wiki.yoctoproject.org/wiki/Yocto_Project_v2.7_Status#Milestone_2_-_Target_Feb._1.2C_2019
>   * We now have resulttool, buildhistory and build-performance all
>     working with the autobuilder and will be using this as the primary
>     QA mechanism going forward. More details can be found here:
>
> http://lists.openembedded.org/pipermail/openembedded-architecture/2019-February/001591.html
>
>   * There were some serious usability issues found with multiconfig,
>     those have been fixed in master and thud.
>   * Various recipe upgrades made it in, thanks to all who contributed.
>     Several recipes also converted to meson including glib-2.0 and
>     gdk-pixbuf.
>   * We now need to build M3 as we’re past feature freeze point for
>     2.7. Right now we’re aware of the following things which ideally
>     need to be resolved first:
>       o Bug 13178 “X server and matchbox desktop don't start up
>         properly on beaglebone” needs to be fixed
>
a patch was sent and  is in master.
http://git.yoctoproject.org/cgit/cgit.cgi/poky/commit/?id=4860914b3b5b38926ed6a80bb83a011d341ff2d8


- armin
>
>      o
>       o Find the framebuffer problem with qemuarmv7 and switch to that
>       o Several ptest issues would be addressed (missing openssl
>         tests, 3 timeouts)
>       o Arm build host issues identified and resolved
>   * It’s unlikely we’ll switch to virtgl by default for 2.7 due to
>     lack of testing from the community although the base patches for
>     this have merged.
>
>  
>
> Planned Releases for YP 2.7:
>
>   * YP 2.7 M2 rc2 is out of QA.
>   * YP 2.7 M2 Release Target was Feb. 1, 2019
>   * YP 2.7 M3 Cutoff is Feb. 25, 2019
>   * YP 2.7 M3 Release Target is Mar. 8, 2019
>   * YP 2.7 M4 Cutoff is Apr. 1, 2019
>   * YP 2.7 M4 Release Target is Apr. 26, 2019
>
>  
>
> Planned upcoming dot releases:
>
>   * YP 2.5.3 (Sumo) will be targeted after YP 2.7 M2 is done.
>   * YP 2.5.4 (Sumo) will be targeted after YP 2.7 M4 is done.
>   * YP 2.6.2 (Thud) will be targeted after YP 2.5.4 is done.
>
>  
>
> Tracking Metrics:
>
>   * WDD 2415 (last week
>     2392)(https://wiki.yoctoproject.org/charts/combo.html)
>   * Poky Patch Metrics  
>       o Total patches found: 1516 (last week 1527)
>       o Patches in the Pending State: 660 (44%) [last week 663 (43%)]
>
>  
>
> Key Status Links for YP:
>
> https://wiki.yoctoproject.org/wiki/Yocto_Project_v2.7_Status
>
> https://wiki.yoctoproject.org/wiki/Yocto_2.7_Schedule
>
> https://wiki.yoctoproject.org/wiki/Yocto_2.7_Features
>
>  
>
> The Status reports are now stored on the wiki at:
> https://wiki.yoctoproject.org/wiki/Weekly_Status
>
>  
>
> [If anyone has suggestions for other information you’d like to see on
> this weekly status update, let us know!]
>
>  
>
> Thanks,
>
>  
>
> */Stephen K. Jolley/**//*
>
> *Yocto Project Program Manager*
>
> (    *Cell*:                (208) 244-4460
>
> * *Email*:              _sjolley.yp.pm@gmail.com
> <mailto:sjolley.yp.pm@gmail.com>_
>
>  
>
>


[-- Attachment #2: Type: text/html, Size: 44236 bytes --]

^ permalink raw reply	[flat|nested] 2+ messages in thread

end of thread, other threads:[~2019-03-02 23:01 UTC | newest]

Thread overview: 2+ messages (download: mbox.gz follow: Atom feed
-- links below jump to the message on this page --
2019-02-26 15:58 Yocto Project Status WW09'19 sjolley.yp.pm
2019-03-02 23:01 ` akuster

This is an external index of several public inboxes,
see mirroring instructions on how to clone and mirror
all data and code used by this external index.