Current Dev Position: YP 3.1 M3
Next Deadline: YP 3.1 M3 build date 2/24/2020
Next Team Meetings:
* Bug Triage meeting Thursday Feb. 20th at 7:30am PDT (
<https://zoom.us/j/454367603> https://zoom.us/j/454367603)
* Monthly Project Meeting Tuesday Mar. 3rd at 8am PDT (
<https://zoom.us/j/990892712> https://zoom.us/j/990892712)
* Weekly Engineering Sync Tuesday Feb. 18th at 8am PDT (
<https://zoom.us/j/990892712> https://zoom.us/j/990892712)
* Twitch - Next event is Tuesday Mar. 10th at 8am PDT (
<https://www.twitch.tv/yocto_project> https://www.twitch.tv/yocto_project)
Key Status/Updates:
* The project recently updated its git hosting infrastructure and
there were some issues encountered with the cgit http/https repository
sharing. Those issues should now be resolved, apologies if they caused
issues for anyone. The git:// protocol sharing was unaffected.
* YP 3.0.2 rc2 is in QA with the report due soon.
* We continue to see a small number of reproducibility issues with
master which need resolving for green builds (in particular gstreamer and
perl).
* A significant memory usage issue was identified during bitbake
parsing where memory usage would grow in each parser thread linearly per
number of recipes parsed. This would therefore particularly affect large
numbers of layers, multilibs and multiconfig. The fix has merged into
bitbake along with the corresponding zeus and warrior branches. For one test
case it reduced peak memory usage during parsing for 5 multiconfigs from
20GB to 2GB.
* Warrior patches for 2.7.3 are out for review.
* With the git infrastructure issue updated, we now have centos8
workers added to the autobuilder.
* We are making various queued changes to the autobuilder
configuration to fix bugs, improve efficiency and test coverage but this may
result in some test result instability as we test and resolve issues.
* We're collecting a list of companies, products and projects which
use the Yocto Project on the wiki:
<https://wiki.yoctoproject.org/wiki/Project_Users>
https://wiki.yoctoproject.org/wiki/Project_Users Please add any you know are
missing (or email Richard/Stephen who can add).
* The triage team is worried about attendance at triage meetings and
the project is finding it hard to find people to help fix bugs. If anyone is
willing to work on bugs, assistance would be greatly appreciated.
YP 3.1 Milestone Dates:
* YP 3.1 M3 build date 2/24/2020
* YP 3.1 M3 release date 3/6/2020
* YP 3.1 M4 build date 3/30/2020
* YP 3.1 M4 release date 4/24/2020
Planned upcoming dot releases:
* YP 2.7.3 built and in QA
* YP 2.7.3 release date 2/21/2020
* YP 3.0.2 build date 2/3/2020
* YP 3.0.2 release date 2/14/2020
Tracking Metrics:
* WDD 2710 (last week 2728) (
<https://wiki.yoctoproject.org/charts/combo.html>
https://wiki.yoctoproject.org/charts/combo.html)
* Poky Patch Metrics
* Total patches found: 1360 (last week 1361)
* Patches in the Pending State: 546 (40%) [last week 547 (40%)]
The Yocto Project's technical governance is through its Technical Steering
Committee, more information is available at:
<https://wiki.yoctoproject.org/wiki/TSC>
https://wiki.yoctoproject.org/wiki/TSC
The Status reports are now stored on the wiki at:
<https://wiki.yoctoproject.org/wiki/Weekly_Status>
https://wiki.yoctoproject.org/wiki/Weekly_Status
[If anyone has suggestions for other information you'd like to see on this
weekly status update, let us know!]
Thanks,
Stephen K. Jolley
Yocto Project Program Manager
* Cell: (208) 244-4460
* Email: <mailto:sjolley.yp.pm@gmail.com>
sjolley.yp.pm@gmail.com
[-- Attachment #2: Type: text/html, Size: 24826 bytes --]
WARNING: multiple messages have this Message-ID (diff)
From: "Stephen Jolley" <sjolley.yp.pm@gmail.com>
To: <yocto@yoctoproject.org>, <openembedded-core@lists.openembedded.org>
Subject: Yocto Project Status WW07'20
Date: Tue, 18 Feb 2020 08:09:38 -0800 [thread overview]
Message-ID: <0b8a01d5e675$d2363e30$76a2ba90$@gmail.com> (raw)
[-- Attachment #1: Type: text/plain, Size: 3762 bytes --]
Current Dev Position: YP 3.1 M3
Next Deadline: YP 3.1 M3 build date 2/24/2020
Next Team Meetings:
* Bug Triage meeting Thursday Feb. 20th at 7:30am PDT (
<https://zoom.us/j/454367603> https://zoom.us/j/454367603)
* Monthly Project Meeting Tuesday Mar. 3rd at 8am PDT (
<https://zoom.us/j/990892712> https://zoom.us/j/990892712)
* Weekly Engineering Sync Tuesday Feb. 18th at 8am PDT (
<https://zoom.us/j/990892712> https://zoom.us/j/990892712)
* Twitch - Next event is Tuesday Mar. 10th at 8am PDT (
<https://www.twitch.tv/yocto_project> https://www.twitch.tv/yocto_project)
Key Status/Updates:
* The project recently updated its git hosting infrastructure and
there were some issues encountered with the cgit http/https repository
sharing. Those issues should now be resolved, apologies if they caused
issues for anyone. The git:// protocol sharing was unaffected.
* YP 3.0.2 rc2 is in QA with the report due soon.
* We continue to see a small number of reproducibility issues with
master which need resolving for green builds (in particular gstreamer and
perl).
* A significant memory usage issue was identified during bitbake
parsing where memory usage would grow in each parser thread linearly per
number of recipes parsed. This would therefore particularly affect large
numbers of layers, multilibs and multiconfig. The fix has merged into
bitbake along with the corresponding zeus and warrior branches. For one test
case it reduced peak memory usage during parsing for 5 multiconfigs from
20GB to 2GB.
* Warrior patches for 2.7.3 are out for review.
* With the git infrastructure issue updated, we now have centos8
workers added to the autobuilder.
* We are making various queued changes to the autobuilder
configuration to fix bugs, improve efficiency and test coverage but this may
result in some test result instability as we test and resolve issues.
* We're collecting a list of companies, products and projects which
use the Yocto Project on the wiki:
<https://wiki.yoctoproject.org/wiki/Project_Users>
https://wiki.yoctoproject.org/wiki/Project_Users Please add any you know are
missing (or email Richard/Stephen who can add).
* The triage team is worried about attendance at triage meetings and
the project is finding it hard to find people to help fix bugs. If anyone is
willing to work on bugs, assistance would be greatly appreciated.
YP 3.1 Milestone Dates:
* YP 3.1 M3 build date 2/24/2020
* YP 3.1 M3 release date 3/6/2020
* YP 3.1 M4 build date 3/30/2020
* YP 3.1 M4 release date 4/24/2020
Planned upcoming dot releases:
* YP 2.7.3 built and in QA
* YP 2.7.3 release date 2/21/2020
* YP 3.0.2 build date 2/3/2020
* YP 3.0.2 release date 2/14/2020
Tracking Metrics:
* WDD 2710 (last week 2728) (
<https://wiki.yoctoproject.org/charts/combo.html>
https://wiki.yoctoproject.org/charts/combo.html)
* Poky Patch Metrics
* Total patches found: 1360 (last week 1361)
* Patches in the Pending State: 546 (40%) [last week 547 (40%)]
The Yocto Project's technical governance is through its Technical Steering
Committee, more information is available at:
<https://wiki.yoctoproject.org/wiki/TSC>
https://wiki.yoctoproject.org/wiki/TSC
The Status reports are now stored on the wiki at:
<https://wiki.yoctoproject.org/wiki/Weekly_Status>
https://wiki.yoctoproject.org/wiki/Weekly_Status
[If anyone has suggestions for other information you'd like to see on this
weekly status update, let us know!]
Thanks,
Stephen K. Jolley
Yocto Project Program Manager
* Cell: (208) 244-4460
* Email: <mailto:sjolley.yp.pm@gmail.com>
sjolley.yp.pm@gmail.com
[-- Attachment #2: Type: text/html, Size: 24826 bytes --]
next reply other threads:[~2020-02-18 16:09 UTC|newest]
Thread overview: 10+ messages / expand[flat|nested] mbox.gz Atom feed top
2020-02-18 16:09 sjolley.yp.pm [this message]
2020-02-18 16:09 ` Yocto Project Status WW07'20 Stephen Jolley
2020-02-18 16:44 ` Alexander Kanavin
2020-02-18 16:44 ` [OE-core] " Alexander Kanavin
2020-02-18 18:21 ` Richard Purdie
2020-02-18 18:21 ` [OE-core] " Richard Purdie
2020-02-20 7:46 ` Jain, Sangeeta
2020-02-20 7:46 ` [OE-core] " Sangeeta Jain
2020-02-20 10:33 ` Richard Purdie
2020-02-20 10:33 ` [OE-core] " Richard Purdie
Reply instructions:
You may reply publicly to this message via plain-text email
using any one of the following methods:
* Save the following mbox file, import it into your mail client,
and reply-to-all from there: mbox
Avoid top-posting and favor interleaved quoting:
https://en.wikipedia.org/wiki/Posting_style#Interleaved_style
* Reply using the --to, --cc, and --in-reply-to
switches of git-send-email(1):
git send-email \
--in-reply-to='0b8a01d5e675$d2363e30$76a2ba90$@gmail.com' \
--to=sjolley.yp.pm@gmail.com \
--cc=openembedded-core@lists.openembedded.org \
--cc=yocto@yoctoproject.org \
/path/to/YOUR_REPLY
https://kernel.org/pub/software/scm/git/docs/git-send-email.html
* If your mail client supports setting the In-Reply-To header
via mailto: links, try the mailto: link
Be sure your reply has a Subject: header at the top and a blank line
before the message body.
This is an external index of several public inboxes,
see mirroring instructions on how to clone and mirror
all data and code used by this external index.