* Tracepoint project: draft timeline for feedback
@ 2026-11-08 11:47 Temitope obabi
2026-11-08 15:22 ` Julia Lawall
2026-11-08 16:55 ` Julian Braha
0 siblings, 2 replies; 3+ messages in thread
From: Temitope obabi @ 2026-11-08 11:47 UTC (permalink / raw)
To: outreachy; +Cc: Steven Rostedt, Julian Braha, julia.lawall
Hi Steven and Julian,
As part of my Outreachy application, I need a project timeline for
removing unused tracepoints. Here is my draft, based on the patches I
have sent so far (assuming about 12 weeks):
Weeks 1-2: Set up the kernel build with tracing enabled. List candidate
tracepoints by checking which definitions have no callers. Choose the
first subsystems to work on, and ask you which ones you prefer.
Weeks 3-5: Send removal patches in small batches, one subsystem at a
time. For each one, check the callers and search lore for duplicates
first. Then build, run checkpatch, send to the maintainers from
get_maintainer, and Cc you and the Outreachy list.
Weeks 6-8: Handle review feedback and send v2 or v3 as needed. Keep a
list of what is sent, accepted or waiting, and follow up politely on
patches with no reply.
Weeks 9-10: Take on harder cases, such as tracepoints that look unused
but might be used by tools like trace-cmd or perf. Ask Steven before
removing anything unclear.
Weeks 11-12: Follow up on unmerged patches, update the status list, and
write the final report.
Do you think this is realistic? Is there anything you would add, remove
or change?
Thank you,
Temitope
^ permalink raw reply [flat|nested] 3+ messages in thread
* Re: Tracepoint project: draft timeline for feedback
2026-11-08 11:47 Tracepoint project: draft timeline for feedback Temitope obabi
@ 2026-11-08 15:22 ` Julia Lawall
2026-11-08 16:55 ` Julian Braha
1 sibling, 0 replies; 3+ messages in thread
From: Julia Lawall @ 2026-11-08 15:22 UTC (permalink / raw)
To: Temitope obabi; +Cc: outreachy, Steven Rostedt, Julian Braha
On Sun, 8 Nov 2026, Temitope obabi wrote:
> Hi Steven and Julian,
>
> As part of my Outreachy application, I need a project timeline for
> removing unused tracepoints. Here is my draft, based on the patches I
> have sent so far (assuming about 12 weeks):
>
> Weeks 1-2: Set up the kernel build with tracing enabled. List candidate
> tracepoints by checking which definitions have no callers. Choose the
> first subsystems to work on, and ask you which ones you prefer.
>
> Weeks 3-5: Send removal patches in small batches, one subsystem at a
> time. For each one, check the callers and search lore for duplicates
> first. Then build, run checkpatch, send to the maintainers from
> get_maintainer, and Cc you and the Outreachy list.
>
> Weeks 6-8: Handle review feedback and send v2 or v3 as needed. Keep a
> list of what is sent, accepted or waiting, and follow up politely on
> patches with no reply.
>
> Weeks 9-10: Take on harder cases, such as tracepoints that look unused
> but might be used by tools like trace-cmd or perf. Ask Steven before
> removing anything unclear.
>
> Weeks 11-12: Follow up on unmerged patches, update the status list, and
> write the final report.
>
> Do you think this is realistic? Is there anything you would add, remove
> or change?
A small detail is that after the application period is over, this list
goes quiet. No need to send patches here.
julia
>
> Thank you,
> Temitope
>
^ permalink raw reply [flat|nested] 3+ messages in thread
* Re: Tracepoint project: draft timeline for feedback
2026-11-08 11:47 Tracepoint project: draft timeline for feedback Temitope obabi
2026-11-08 15:22 ` Julia Lawall
@ 2026-11-08 16:55 ` Julian Braha
1 sibling, 0 replies; 3+ messages in thread
From: Julian Braha @ 2026-11-08 16:55 UTC (permalink / raw)
To: Temitope obabi, outreachy; +Cc: Steven Rostedt, julia.lawall
[-- Attachment #1.1: Type: text/plain, Size: 1601 bytes --]
On 11/8/26 11:47, Temitope obabi wrote:
> Hi Steven and Julian,
>
> As part of my Outreachy application, I need a project timeline for
> removing unused tracepoints. Here is my draft, based on the patches I
> have sent so far (assuming about 12 weeks):
>
> Weeks 1-2: Set up the kernel build with tracing enabled. List candidate
> tracepoints by checking which definitions have no callers. Choose the
> first subsystems to work on, and ask you which ones you prefer.
I think you already have the kernel build setup with tracing enabled for
your existing patches, right?
Also, it may be better to rotate across the different subsystems.
Otherwise, it may overwhelm each maintainer to receive many patches
within one week.
>
> Weeks 3-5: Send removal patches in small batches, one subsystem at a
> time. For each one, check the callers and search lore for duplicates
> first. Then build, run checkpatch, send to the maintainers from
> get_maintainer, and Cc you and the Outreachy list.
>
> Weeks 6-8: Handle review feedback and send v2 or v3 as needed. Keep a
> list of what is sent, accepted or waiting, and follow up politely on
> patches with no reply.
>
> Weeks 9-10: Take on harder cases, such as tracepoints that look unused
> but might be used by tools like trace-cmd or perf. Ask Steven before
> removing anything unclear.
>
> Weeks 11-12: Follow up on unmerged patches, update the status list, and
> write the final report.
>
> Do you think this is realistic? Is there anything you would add, remove
> or change?
>
> Thank you,
> Temitope
>
[-- Attachment #2: OpenPGP digital signature --]
[-- Type: application/pgp-signature, Size: 236 bytes --]
^ permalink raw reply [flat|nested] 3+ messages in thread
end of thread, other threads:[~2026-11-08 16:55 UTC | newest]
Thread overview: 3+ messages (download: mbox.gz follow: Atom feed
-- links below jump to the message on this page --
2026-11-08 11:47 Tracepoint project: draft timeline for feedback Temitope obabi
2026-11-08 15:22 ` Julia Lawall
2026-11-08 16:55 ` Julian Braha
This is an external index of several public inboxes,
see mirroring instructions on how to clone and mirror
all data and code used by this external index.