public inbox for linux-kernel@vger.kernel.org
 help / color / mirror / Atom feed
* Query on Linux process sheduling
@ 2012-03-24 11:55 B.Vinai Kumar
  2012-03-24 14:39 ` Jonathan Corbet
  0 siblings, 1 reply; 3+ messages in thread
From: B.Vinai Kumar @ 2012-03-24 11:55 UTC (permalink / raw)
  To: linux-kernel

Hi Guys,

I have embedded box running 2.6.28.9 linux kernel and running 6 Real
time task threads (With SCHED_RR as scheduling policy).
Together all the 6 threads running is consuming around 85% of CPU,
which is expected.

All the threads have a 10ms of cycle.

The issue is for every second I have observed that for 50ms these Real
time task threads are not scheduling at all. During this 50ms
the process swapper/idle task is being scheduled(pid 0).

Is this the behaviour is due to these values?

# cat /proc/sys/kernel/sched_rt_period_us
1000000
# cat /proc/sys/kernel/sched_rt_runtime_us
950000

What changes can be done to the kernel so that the Real time task
threads get scheduled in that 50ms interval too?

Thanks,
Vinai.

^ permalink raw reply	[flat|nested] 3+ messages in thread

end of thread, other threads:[~2012-04-02 13:00 UTC | newest]

Thread overview: 3+ messages (download: mbox.gz follow: Atom feed
-- links below jump to the message on this page --
2012-03-24 11:55 Query on Linux process sheduling B.Vinai Kumar
2012-03-24 14:39 ` Jonathan Corbet
2012-04-02 13:00   ` B.Vinai Kumar

This is a public inbox, see mirroring instructions
for how to clone and mirror all data and code used for this inbox